Study on delay of JKR project (school) in the state of Kelantan / Nooreen Hasikin Baharudin
It is of the utmost important that the Building Surveyor, as a consultant in any building project to ensure that the project progress and completed within the contract duration. The successful of any project will reflect the efficiency and competency of those involved in the project A construction o...
Saved in:
Main Author: | Baharudin, Nooreen Hasikin |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2003
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/40471/1/40471.pdf https://ir.uitm.edu.my/id/eprint/40471/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Contract management for interim certificates and payment / Azlan Abu Bakar
by: Abu Bakar, Azlan
Published: (2017) -
Dilemma of bumiputera contractor / Zubir Sayuti
by: Sayuti, Zubir
Published: (2007) -
Contractor’s design responsibility in Malaysian traditional and design and build construction contracts: a legal perspective / Abd Hamid Abd Rahman … [et al.]
by: Abd Rahman, Abd Hamid, et al.
Published: (2010) -
Tendering process for Kebabangan Petroleum Operating Company Sdn Bhd (KPOC) at Menara HLA / Muhammad Shahrin Naim Sadri
by: Sadri, Muhammad Shahrin Naim
Published: (2015) -
The development of quality management in Malaysian SMEs contractors / Muhammad Firdaus Hamzan
by: Hamzan, Muhammad Firdaus
Published: (2006)