Study on delay of JKR project (school) in the state of Kelantan / Nooreen Hasikin Baharudin

It is of the utmost important that the Building Surveyor, as a consultant in any building project to ensure that the project progress and completed within the contract duration. The successful of any project will reflect the efficiency and competency of those involved in the project A construction o...

Full description

Saved in:
Bibliographic Details
Main Author: Baharudin, Nooreen Hasikin
Format: Thesis
Language:English
Published: 2003
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/40471/1/40471.pdf
https://ir.uitm.edu.my/id/eprint/40471/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.40471
record_format eprints
spelling my.uitm.ir.404712022-09-30T03:35:07Z https://ir.uitm.edu.my/id/eprint/40471/ Study on delay of JKR project (school) in the state of Kelantan / Nooreen Hasikin Baharudin Baharudin, Nooreen Hasikin Contractors' operations and equipment. Contracting. (General works) Structural engineering Earthwork. Foundations It is of the utmost important that the Building Surveyor, as a consultant in any building project to ensure that the project progress and completed within the contract duration. The successful of any project will reflect the efficiency and competency of those involved in the project A construction organisation is an organisation that often has to face more crisis as compared to other industries. This is due to the problems of securing projects, organization and construction, and lack of sources of materials that usually occurred during peak construction periods. In minimizing the extension of time and delay project, the needs of efficient methods and approaches must be used in construction organisations so as to avoid critical problems. However, delays do occur which would affect the smooth running of the project There are many reasons for such a delay. The fault for the delay may lie on the contractor whereby he may fail to follow specification or order material on time or he may encounter labour problems on site. It could also be due to the fault of the employer for failing to employ a more efficient contractor or where he wrongly anticipates the overall cost of the project. All these delays will cause extra time and money. I, therefore, feel that steps should be taken to prevent any unnecessary delay so that building school project can be completed on time. Thus, the main objective in writing this dissertation is to identify these causes and the implication of such delay in building project. Hopefully, by identifying these causes and its effect and implication, enable better solutions which may benefit the building industry in this country. “Prevention is better than cure; thus I hope this study analysis can provide some additional knowledge to help local contractors and project managers in the effort to focus and minimize the delay school project under JKR Kelantan Hopefully, with the current positive growing economic scenario, especially in construction industry, Kelantan Darul Nairn especially, can emerge as a fully developed tourism country by the year 2020 2003 Thesis NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/40471/1/40471.pdf Study on delay of JKR project (school) in the state of Kelantan / Nooreen Hasikin Baharudin. (2003) Degree thesis, thesis, Universiti Teknologi MARA.
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Contractors' operations and equipment. Contracting. (General works)
Structural engineering
Earthwork. Foundations
spellingShingle Contractors' operations and equipment. Contracting. (General works)
Structural engineering
Earthwork. Foundations
Baharudin, Nooreen Hasikin
Study on delay of JKR project (school) in the state of Kelantan / Nooreen Hasikin Baharudin
description It is of the utmost important that the Building Surveyor, as a consultant in any building project to ensure that the project progress and completed within the contract duration. The successful of any project will reflect the efficiency and competency of those involved in the project A construction organisation is an organisation that often has to face more crisis as compared to other industries. This is due to the problems of securing projects, organization and construction, and lack of sources of materials that usually occurred during peak construction periods. In minimizing the extension of time and delay project, the needs of efficient methods and approaches must be used in construction organisations so as to avoid critical problems. However, delays do occur which would affect the smooth running of the project There are many reasons for such a delay. The fault for the delay may lie on the contractor whereby he may fail to follow specification or order material on time or he may encounter labour problems on site. It could also be due to the fault of the employer for failing to employ a more efficient contractor or where he wrongly anticipates the overall cost of the project. All these delays will cause extra time and money. I, therefore, feel that steps should be taken to prevent any unnecessary delay so that building school project can be completed on time. Thus, the main objective in writing this dissertation is to identify these causes and the implication of such delay in building project. Hopefully, by identifying these causes and its effect and implication, enable better solutions which may benefit the building industry in this country. “Prevention is better than cure; thus I hope this study analysis can provide some additional knowledge to help local contractors and project managers in the effort to focus and minimize the delay school project under JKR Kelantan Hopefully, with the current positive growing economic scenario, especially in construction industry, Kelantan Darul Nairn especially, can emerge as a fully developed tourism country by the year 2020
format Thesis
author Baharudin, Nooreen Hasikin
author_facet Baharudin, Nooreen Hasikin
author_sort Baharudin, Nooreen Hasikin
title Study on delay of JKR project (school) in the state of Kelantan / Nooreen Hasikin Baharudin
title_short Study on delay of JKR project (school) in the state of Kelantan / Nooreen Hasikin Baharudin
title_full Study on delay of JKR project (school) in the state of Kelantan / Nooreen Hasikin Baharudin
title_fullStr Study on delay of JKR project (school) in the state of Kelantan / Nooreen Hasikin Baharudin
title_full_unstemmed Study on delay of JKR project (school) in the state of Kelantan / Nooreen Hasikin Baharudin
title_sort study on delay of jkr project (school) in the state of kelantan / nooreen hasikin baharudin
publishDate 2003
url https://ir.uitm.edu.my/id/eprint/40471/1/40471.pdf
https://ir.uitm.edu.my/id/eprint/40471/
_version_ 1745565272636391424
score 13.160551