Notification of completion rectification / Ahmad Hassanuddin Md Ishak
The task been given is to perform a defect inspection mainly for project Suriaman 2A at Bandar Sri Sendayan, in this case study is Unit 188. The doublestorey terrace has 277 units in total. Besides, Suriaman 2A is neighboring with Suriaman 2B and Suriaman 1. The units in Suriaman 2A were built-up o...
Saved in:
Main Author: | |
---|---|
Format: | Student Project |
Language: | English |
Published: |
2019
|
Subjects: | |
Online Access: | http://ir.uitm.edu.my/id/eprint/32619/1/32619.pdf http://ir.uitm.edu.my/id/eprint/32619/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!