Notification of completion rectification / Ahmad Hassanuddin Md Ishak
The task been given is to perform a defect inspection mainly for project Suriaman 2A at Bandar Sri Sendayan, in this case study is Unit 188. The doublestorey terrace has 277 units in total. Besides, Suriaman 2A is neighboring with Suriaman 2B and Suriaman 1. The units in Suriaman 2A were built-up o...
Saved in:
Main Author: | |
---|---|
Format: | Student Project |
Language: | English |
Published: |
2019
|
Subjects: | |
Online Access: | http://ir.uitm.edu.my/id/eprint/32619/1/32619.pdf http://ir.uitm.edu.my/id/eprint/32619/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uitm.ir.32619 |
---|---|
record_format |
eprints |
spelling |
my.uitm.ir.326192020-07-16T07:32:25Z http://ir.uitm.edu.my/id/eprint/32619/ Notification of completion rectification / Ahmad Hassanuddin Md Ishak Ahmad Hassanuddin, Md Ishak Management. Industrial Management Building inspection Architectural engineering. Structural engineering of buildings The task been given is to perform a defect inspection mainly for project Suriaman 2A at Bandar Sri Sendayan, in this case study is Unit 188. The doublestorey terrace has 277 units in total. Besides, Suriaman 2A is neighboring with Suriaman 2B and Suriaman 1. The units in Suriaman 2A were built-up of 2,807 square feet and two-storey super link comes with 4 bedrooms and bathrooms each. This project was constructed in 2015 and completed in 2018. The project team involved are KW ASSOCIATE ARCHITECTS SDN BHD Architect, MEXCELCON is the main contractor for the project and also act as the engineering team. The sub-contractor for electrical is OTT Electrical. Mr. Desmond Siaw is the Project Unit Leader (PUL) the one who responsible to coordinate and lead the team on site. 2019 Student Project NonPeerReviewed text en http://ir.uitm.edu.my/id/eprint/32619/1/32619.pdf Ahmad Hassanuddin, Md Ishak (2019) Notification of completion rectification / Ahmad Hassanuddin Md Ishak. [Student Project] |
institution |
Universiti Teknologi Mara |
building |
Tun Abdul Razak Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Mara |
content_source |
UiTM Institutional Repository |
url_provider |
http://ir.uitm.edu.my/ |
language |
English |
topic |
Management. Industrial Management Building inspection Architectural engineering. Structural engineering of buildings |
spellingShingle |
Management. Industrial Management Building inspection Architectural engineering. Structural engineering of buildings Ahmad Hassanuddin, Md Ishak Notification of completion rectification / Ahmad Hassanuddin Md Ishak |
description |
The task been given is to perform a defect inspection mainly for project Suriaman 2A at Bandar Sri Sendayan, in this case study is Unit 188. The doublestorey terrace has 277 units in total. Besides, Suriaman 2A is neighboring with
Suriaman 2B and Suriaman 1. The units in Suriaman 2A were built-up of 2,807 square feet and two-storey super link comes with 4 bedrooms and bathrooms each. This project was constructed in 2015 and completed in 2018.
The project team involved are KW ASSOCIATE ARCHITECTS SDN BHD Architect, MEXCELCON is the main contractor for the project and also act as the engineering team. The sub-contractor for electrical is OTT Electrical. Mr. Desmond Siaw is the Project Unit Leader (PUL) the one who responsible
to coordinate and lead the team on site. |
format |
Student Project |
author |
Ahmad Hassanuddin, Md Ishak |
author_facet |
Ahmad Hassanuddin, Md Ishak |
author_sort |
Ahmad Hassanuddin, Md Ishak |
title |
Notification of completion rectification / Ahmad Hassanuddin Md Ishak |
title_short |
Notification of completion rectification / Ahmad Hassanuddin Md Ishak |
title_full |
Notification of completion rectification / Ahmad Hassanuddin Md Ishak |
title_fullStr |
Notification of completion rectification / Ahmad Hassanuddin Md Ishak |
title_full_unstemmed |
Notification of completion rectification / Ahmad Hassanuddin Md Ishak |
title_sort |
notification of completion rectification / ahmad hassanuddin md ishak |
publishDate |
2019 |
url |
http://ir.uitm.edu.my/id/eprint/32619/1/32619.pdf http://ir.uitm.edu.my/id/eprint/32619/ |
_version_ |
1685650949365825536 |
score |
13.211869 |