Ground improvement constructions with particular reference to stone column (case study : electrified double track project between Rawang and Ipoh) / Masfarizan Maslan
The use of ground improvement is to increase bearing capacity, settlement control, lateral stability which has proven to be a cost effective improvement subsoil compare to the pile embankment system. The stone column method is one of the ground improvement works. The Electrified Double Track Projec...
Saved in:
Main Author: | Maslan, Masfarizan |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2003
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/2770/1/2770.PDF https://ir.uitm.edu.my/id/eprint/2770/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Implikasi pembinaan lebuhraya Utara-Selatan terhadap kawasan sekitar. Kes kajian : Rawang / Mohamad Ya'cub
by: Ya'cub, Mohamad
Published: (1996) -
An overview of lane changing model at signalised intersection / Jezan Md Diah, Li Sian Tey and Fathiyah Roslee
by: Md Diah, Jezan, et al.
Published: (2016) -
Tropical environment elements for green highway assessment / Asmalia Che Ahmad ...[et al.]
by: Che Ahmad, Asmalia, et al.
Published: (2016) -
An overview of the toll collection system of the Malaysian highway authority / Rozana Abdul Kadir
by: Abdul Kadir, Rozana
Published: (1988) -
Improvements on the service design of DBKK's parking system / Joshua Thomas Daungkil, Albert Joseph Lintanga and Justin Yonsoding
by: Daungkil, Joshua Thomas, et al.
Published: (2007)