Ground improvement constructions with particular reference to stone column (case study : electrified double track project between Rawang and Ipoh) / Masfarizan Maslan
The use of ground improvement is to increase bearing capacity, settlement control, lateral stability which has proven to be a cost effective improvement subsoil compare to the pile embankment system. The stone column method is one of the ground improvement works. The Electrified Double Track Projec...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2003
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/2770/1/2770.PDF https://ir.uitm.edu.my/id/eprint/2770/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|