To set up a mini chrome plating plant in the material science laboratory / Razali Abd. Ghani and Mohd. Ramli Hasan
Before setting up a chromium plating plant, it is necessary to study and analyse thoroughly the various process stages involved, for which each stage has different operating conditions to be employed. The important factors in setting up the plant are D.C. power sources available, tank material, tank...
Saved in:
Main Authors: | Abd. Ghani, Razali, Hasan, Mohd. Ramli |
---|---|
Format: | Student Project |
Language: | English |
Published: |
Faculty of Mechanical Engineering
1986
|
Subjects: | |
Online Access: | http://ir.uitm.edu.my/id/eprint/25883/1/PPb_RAZALI%20ABD%20GHANI%20EM%2086_5.pdf http://ir.uitm.edu.my/id/eprint/25883/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Blanking die process for production product / Marwan Hasan and Kamarul Baharin Mansor
by: Hasan, Marwan, et al.
Published: (1996) -
Aquamood / Noramira Syakira Razali
by: Razali, Noramira Syakira
Published: (2024) -
Rotary grill-gen2 / Abdul Hafiz Ramli ... [et al.]
by: Ramli, Abdul Hafiz, et al.
Published: (2019) -
Hopper’s armchair / Noramira Syakira Razali
by: Razali, Noramira Syakira
Published: (2024) -
Report of an upgrading works of Keretapi Tanah Melayu Berhad mini museum for Keretapi Tanah Melayu Berhad at Kuala Lumpur railway station, Jalan Sultan Hisamuddin, Kuala Lumpur / Nurul Amirah Azman
by: Azman, Nurul Amirah
Published: (2010)