To set up a mini chrome plating plant in the material science laboratory / Razali Abd. Ghani and Mohd. Ramli Hasan
Before setting up a chromium plating plant, it is necessary to study and analyse thoroughly the various process stages involved, for which each stage has different operating conditions to be employed. The important factors in setting up the plant are D.C. power sources available, tank material, tank...
Saved in:
Main Authors: | , |
---|---|
Format: | Student Project |
Language: | English |
Published: |
Faculty of Mechanical Engineering
1986
|
Subjects: | |
Online Access: | http://ir.uitm.edu.my/id/eprint/25883/1/PPb_RAZALI%20ABD%20GHANI%20EM%2086_5.pdf http://ir.uitm.edu.my/id/eprint/25883/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|