Delay factors in green building development projects in Malaysia : a phenomenological study
The purpose of this phenomenological qualitative study was to identify the primary causes of delays in green building construction project in Malaysia that employ the GBI rating system as perceived by the green building consultants that were involved in the project. There are three objectives to...
Saved in:
Main Author: | Alfonso bin Johan, |
---|---|
Format: | Thesis |
Published: |
2013
|
Subjects: | |
Online Access: | http://library.oum.edu.my/repository/947/1/library-document-947.pdf http://library.oum.edu.my/repository/947/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Causes of delay in Malaysian IT projects
by: Fanurul Kemp, Abd Hakim
Published: (2013) -
Project delays recovery on construction work
by: Adiwati, Shinta
Published: (1999) -
Sustainability goals and project success from the perspective of the stakeholders of green building project in Malaysia: a preliminary study
by: Nor Kalsum Mohd Isa
Published: (2018) -
The effects of non-excusable delay in construction project
by: Nor Shahira, Shaari
Published: (2014) -
A study to identify the factor that causes project delay in construction at Terengganu
by: Nurul Syakirah, Mohd Ali
Published: (2016)