Delay factors in green building development projects in Malaysia : a phenomenological study
The purpose of this phenomenological qualitative study was to identify the primary causes of delays in green building construction project in Malaysia that employ the GBI rating system as perceived by the green building consultants that were involved in the project. There are three objectives to...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Published: |
2013
|
Subjects: | |
Online Access: | http://library.oum.edu.my/repository/947/1/library-document-947.pdf http://library.oum.edu.my/repository/947/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|