Scheduling problems with generalized precedence relations
In this paper, we consider the single machine scheduling problem with generalized precedence relations. A precedence delay specifies a time delay between the completion of job Ji and start of job Jj must be at least lij when job Ji precedes job Jj. The fuzzy precedence relation relaxes the preceden...
Saved in:
Main Authors: | Kanesan , Muthusamy, Ishii, Hiroaki, Vlach, Milan |
---|---|
Format: | Conference or Workshop Item |
Published: |
1999
|
Subjects: | |
Online Access: | http://library.oum.edu.my/repository/615/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Scheduling with fuzzy delays and fuzzy precedences
by: Kanesan , Muthusamy, et al.
Published: (2003) -
Scheduling Problem with Fuzzy Due-dates on Unrelated Parallel Processors
by: Kanesan , Muthusamy, et al.
Published: (2000) -
Beam Search Approach for the Multiobjective Flow-shop Scheduling Problem
by: Kanesan , Muthusamy, et al.
Published: (2000) -
Single machine batching problem to minimize the sum of completion times with number of batches and batch size limitations
by: Kanesan , Muthusamy, et al.
Published: (2001) -
Optimization of Traveling Salesman Problem with Precedence Constraint using Particle Swarm Optimization
by: M. F. F., Ab Rashid, et al.
Published: (2015)