A study on time based for visual inspectors at Western Digital Batu Kawan production line
This research is aimed to develop time-based guidelines that can help to preserve the optical health of the visual inspectors at SanDisk Storage Malaysia (a WD company). The research objectives is to identify the time patterns where defect escapees occur, to analyse relationship between time and...
Saved in:
Main Author: | Puspavathi, S. Rama Naidu |
---|---|
Format: | Thesis |
Published: |
2021
|
Subjects: | |
Online Access: | http://library.oum.edu.my/repository/1533/1/library-document-1533.pdf http://library.oum.edu.my/repository/1533/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Productivity study and line balancing of GGMG & CALICO production line
by: Hartini, Mustafa, et al.
Published: (2012) -
Productivity improvement through line balancing
by: Hazmil, Hapaz
Published: (2008) -
An integrated model for production line balancing planning
by: Ali, A. J. Adham
Published: (2012) -
Simulation of assembly line for production performance improvement
by: Mohd Saiful Akmal, Razali
Published: (2016) -
Simulation Modeling for Balancing and Optimizing a Digital Measuring Device (DMD) Production Line
by: Abdullah, Rohana, et al.
Published: (2008)