Modeling a conceptual framework for owner- contractor relationship and time–cost trade-off using fuzzy logic technique

This paper proposes a conceptual framework for owner- contractor relationship and time–cost trade-off analysis of construction project control system using fuzzy logic approach. Construction projects require a well-defined starting point and well-defined finish point with accurate resource allocat...

Full description

Saved in:
Bibliographic Details
Main Authors: Al Hazza, Muataz Hazza Faizi, Adesta, Erry Yulian Triblas, Al Fadel, Mohammad
Format: Conference or Workshop Item
Language:English
English
Published: Institute of Electrical and Electronics Engineers Inc. 2015
Subjects:
Online Access:http://irep.iium.edu.my/42771/1/42771.pdf
http://irep.iium.edu.my/42771/4/42771_Modeling%20a%20conceptual%20framework.SCOPUS.pdf
http://irep.iium.edu.my/42771/
http://10.1109/ACSAT.2014.38
Tags: Add Tag
No Tags, Be the first to tag this record!
Be the first to leave a comment!
You must be logged in first