Modeling a conceptual framework for owner- contractor relationship and time–cost trade-off using fuzzy logic technique

This paper proposes a conceptual framework for owner- contractor relationship and time–cost trade-off analysis of construction project control system using fuzzy logic approach. Construction projects require a well-defined starting point and well-defined finish point with accurate resource allocat...

Full description

Saved in:
Bibliographic Details
Main Authors: Al Hazza, Muataz Hazza Faizi, Adesta, Erry Yulian Triblas, Al Fadel, Mohammad
Format: Conference or Workshop Item
Language:English
English
Published: Institute of Electrical and Electronics Engineers Inc. 2015
Subjects:
Online Access:http://irep.iium.edu.my/42771/1/42771.pdf
http://irep.iium.edu.my/42771/4/42771_Modeling%20a%20conceptual%20framework.SCOPUS.pdf
http://irep.iium.edu.my/42771/
http://10.1109/ACSAT.2014.38
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.iium.irep.42771
record_format dspace
spelling my.iium.irep.427712017-09-25T06:18:16Z http://irep.iium.edu.my/42771/ Modeling a conceptual framework for owner- contractor relationship and time–cost trade-off using fuzzy logic technique Al Hazza, Muataz Hazza Faizi Adesta, Erry Yulian Triblas Al Fadel, Mohammad T Technology (General) This paper proposes a conceptual framework for owner- contractor relationship and time–cost trade-off analysis of construction project control system using fuzzy logic approach. Construction projects require a well-defined starting point and well-defined finish point with accurate resource allocation to avoid any cost overrun. During the lifecycle of the project, different problems can appear. The most important ones are delay and construction cost overrun during the executing phase of the project. To avoid that, an effective planning system with effective control technique is a crucial issue. The main objectives of this research are to develop and design a conceptual framework that may be a guide for the contractor and the owner for controlling the construction projects. The results show that a good conceptual framework need to start with breaking down the project in conjunction with analyzing the cost and time to have both the contractor and the owner the better and less risk in having a good proposal in time, cost and quality. However the final framework show that a need for continuous feedback from the owner to the contractor during the planning process and also can help in designing and developing a proposal that satisfy both the contractor and the owner in terms in time, cost and quality. Risk assessment should be one of the main factors that should be considered during all steps in monitoring, planning and controlling the project. Finally a simulation has been done using the Fuzzy logic approach to validate the conceptual framework) Institute of Electrical and Electronics Engineers Inc. 2015 Conference or Workshop Item REM application/pdf en http://irep.iium.edu.my/42771/1/42771.pdf application/pdf en http://irep.iium.edu.my/42771/4/42771_Modeling%20a%20conceptual%20framework.SCOPUS.pdf Al Hazza, Muataz Hazza Faizi and Adesta, Erry Yulian Triblas and Al Fadel, Mohammad (2015) Modeling a conceptual framework for owner- contractor relationship and time–cost trade-off using fuzzy logic technique. In: 3rd International Conference on Advanced Computer Science Applications and Technologies – ACSAT2014, 29-30 Dec 2014, Amman- Jordan. http://10.1109/ACSAT.2014.38 DOI: 10.1109/ACSAT.2014.38
institution Universiti Islam Antarabangsa Malaysia
building IIUM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider International Islamic University Malaysia
content_source IIUM Repository (IREP)
url_provider http://irep.iium.edu.my/
language English
English
topic T Technology (General)
spellingShingle T Technology (General)
Al Hazza, Muataz Hazza Faizi
Adesta, Erry Yulian Triblas
Al Fadel, Mohammad
Modeling a conceptual framework for owner- contractor relationship and time–cost trade-off using fuzzy logic technique
description This paper proposes a conceptual framework for owner- contractor relationship and time–cost trade-off analysis of construction project control system using fuzzy logic approach. Construction projects require a well-defined starting point and well-defined finish point with accurate resource allocation to avoid any cost overrun. During the lifecycle of the project, different problems can appear. The most important ones are delay and construction cost overrun during the executing phase of the project. To avoid that, an effective planning system with effective control technique is a crucial issue. The main objectives of this research are to develop and design a conceptual framework that may be a guide for the contractor and the owner for controlling the construction projects. The results show that a good conceptual framework need to start with breaking down the project in conjunction with analyzing the cost and time to have both the contractor and the owner the better and less risk in having a good proposal in time, cost and quality. However the final framework show that a need for continuous feedback from the owner to the contractor during the planning process and also can help in designing and developing a proposal that satisfy both the contractor and the owner in terms in time, cost and quality. Risk assessment should be one of the main factors that should be considered during all steps in monitoring, planning and controlling the project. Finally a simulation has been done using the Fuzzy logic approach to validate the conceptual framework)
format Conference or Workshop Item
author Al Hazza, Muataz Hazza Faizi
Adesta, Erry Yulian Triblas
Al Fadel, Mohammad
author_facet Al Hazza, Muataz Hazza Faizi
Adesta, Erry Yulian Triblas
Al Fadel, Mohammad
author_sort Al Hazza, Muataz Hazza Faizi
title Modeling a conceptual framework for owner- contractor relationship and time–cost trade-off using fuzzy logic technique
title_short Modeling a conceptual framework for owner- contractor relationship and time–cost trade-off using fuzzy logic technique
title_full Modeling a conceptual framework for owner- contractor relationship and time–cost trade-off using fuzzy logic technique
title_fullStr Modeling a conceptual framework for owner- contractor relationship and time–cost trade-off using fuzzy logic technique
title_full_unstemmed Modeling a conceptual framework for owner- contractor relationship and time–cost trade-off using fuzzy logic technique
title_sort modeling a conceptual framework for owner- contractor relationship and time–cost trade-off using fuzzy logic technique
publisher Institute of Electrical and Electronics Engineers Inc.
publishDate 2015
url http://irep.iium.edu.my/42771/1/42771.pdf
http://irep.iium.edu.my/42771/4/42771_Modeling%20a%20conceptual%20framework.SCOPUS.pdf
http://irep.iium.edu.my/42771/
http://10.1109/ACSAT.2014.38
_version_ 1643612255069143040
score 13.18916