DEVELOPMENT OF ARTIFICIAL INTELLIGENT PREDICTION MODEL FOR DELAYS AND COST OVERRUNS DURING THE CONSTRUCTION OF PALM OIL REFINERY PROJECTS IN MALAYSIA
.
Saved in:
Main Author: | LIM ABDULLAH , MUHAMMAD SANI |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2020
|
Subjects: | |
Online Access: | http://utpedia.utp.edu.my/20750/1/Muhammad%20Sani%20Lim%20Abdullah_G01219.pdf http://utpedia.utp.edu.my/20750/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Delay and cost overrun of palm oil refinery construction projects: Artificial neural network (ann) model
by: Abdullah, M.S., et al.
Published: (2021) -
Delay and cost overrun of palm oil refinery construction projects: Artificial neural network (ann) model
by: Abdullah, M.S., et al.
Published: (2021) -
Delay and cost overrun of palm oil refinery construction projects: Artificial neural network (ann) model
by: Abdullah, M.S., et al.
Published: (2021) -
Causes of project delay and cost overrun of mega projects in peninsular Malaysia
by: Nur Aliya Najiha, Tamrin
Published: (2019) -
Impact of the cost overrun factors on the project delays in construction industry
by: Noor Elinah, Sailin
Published: (2018)