Cold and hot water plumbing system on living quarters in an offshore platform
The detailed development for East Piatu (EP) will have a separate Wellhead Platform (WP) with 12 well slots, bridge linked to a manned Centnu Production Platform (CPP) in 63 meters water depth. Produced oil and gas will be exported via pipelines and tie-in to the export pipelines ofLarut·A produc...
Saved in:
Main Author: | |
---|---|
Format: | Final Year Project |
Language: | English |
Published: |
IRC
2011
|
Subjects: | |
Online Access: | http://utpedia.utp.edu.my/15275/1/Hot%20And%20Cold%20Water%20Plumbing%20System%20On%20Living%20Quarters%20In%20An%20Offshore%20Platfrom.pdf http://utpedia.utp.edu.my/15275/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|