Cold and hot water plumbing system on living quarters in an offshore platform

The detailed development for East Piatu (EP) will have a separate Wellhead Platform (WP) with 12 well slots, bridge linked to a manned Centnu Production Platform (CPP) in 63 meters water depth. Produced oil and gas will be exported via pipelines and tie-in to the export pipelines ofLarut·A produc...

Full description

Saved in:
Bibliographic Details
Main Author: SHAHIR, ADIB ZULFADHLI
Format: Final Year Project
Language:English
Published: IRC 2011
Subjects:
Online Access:http://utpedia.utp.edu.my/15275/1/Hot%20And%20Cold%20Water%20Plumbing%20System%20On%20Living%20Quarters%20In%20An%20Offshore%20Platfrom.pdf
http://utpedia.utp.edu.my/15275/
Tags: Add Tag
No Tags, Be the first to tag this record!