The feasible use of the uk delay and disruption protocol in Malaysian construction industry
Saved in:
Main Author: | Tan, Chuan Kee |
---|---|
Format: | Final Year Project / Dissertation / Thesis |
Published: |
2012
|
Subjects: | |
Online Access: | http://eprints.utar.edu.my/599/1/SCA%2D2012%2D1101350%2D1.pdf http://eprints.utar.edu.my/599/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
THE STUDY OF DELAY AND SUCCESS FACTORS IN MALAYSIAN CONSTRUCTION INDUSTRY
by: Nik Man, Nik Fatimah
Published: (2013) -
Causes and effects of delays in Malaysian construction industry
by: Sambasivan, Murali, et al.
Published: (2007) -
Modern method of construction: An experience from UK construction industry
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2014) -
Causes of delay and cost overrun in Malaysian construction industry
by: Muhammad, Muhammad Tahir, et al.
Published: (2017) -
The effects of delays in construction industry
by: Seth, Azhan
Published: (2005)