The influence of delay factors on Pahang Malaysian construction industry: A PLS-SEM approach
Previous research has shown that delay is a common problem in construction industry. Weather condition and regulation changes, though being minor factors, are also known as external factors contributing to the delay of project construction. This study involved 118 respondents from the construction...
محفوظ في:
المؤلفون الرئيسيون: | , , |
---|---|
التنسيق: | مقال |
اللغة: | English |
منشور في: |
Penerbit Universiti Malaysia Pahang
2021
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://umpir.ump.edu.my/id/eprint/32786/1/The%20influence%20of%20delay%20factors%20on%20Pahang.pdf http://umpir.ump.edu.my/id/eprint/32786/ https://doi.org/10.15282/ijim.11.1.2021.6120 https://doi.org/10.15282/ijim.11.1.2021.6120 |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|