Conceptual model of cost-benefit analysis for monetary and non-monetary items in industrialised building system (IBS) project
Industrialised Building System (IBS) is known as a construction system that consists of a combination of components manufactured either on-site or off-site then positioned and assembled into structures. Among the benefits of IBS construction includes labour cost reduction, support desirable enviro...
Saved in:
Main Authors: | Siti Nur Atikah Abd Rashid,, Natasha Khalil,, Haryati Mohd Isa, |
---|---|
Format: | Article |
Language: | English |
Published: |
Penerbit Universiti Kebangsaan Malaysia
2019
|
Online Access: | http://journalarticle.ukm.my/13681/1/376-1421-1-PB.pdf http://journalarticle.ukm.my/13681/ http://spaj.ukm.my/jsb/index.php/jbp/issue/view/Special%20Issue |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Factors influencing the construction cost of Industrialised Building System (IBS) projects
by: Ahmad Bari, Nor Azmi, et al.
Published: (2012) -
The influence of monetary and non monetary rewards
on employee performance
by: Sabriye, Basmo Ahmed
Published: (2020) -
Establishment of cost-benefit analysis (CBA) sustainable indicators for industrialised building system (IBS) projects: best practice / Siti Nur Atikah Abd Rashid
by: Abd Rashid, Siti Nur Atikah
Published: (2021) -
Adaptable effectiveness of industrialised building (IBS) in construction projects
by: Zulkarnain, Muhamad
Published: (2013) -
Affect of non-monetary benefit on employee performance / Nadia Azlin Abdullah
by: Abdullah, Nadia Azlin
Published: (2019)