Analysis of delays in Tanzanian construction industry: Transaction cost economics (TCE) and structural equation modeling (SEM) approach

Purpose The purpose of this paper is twofold: first, to develop theoretical underpinnings using TCE, and second, to run the analysis using an advanced tool such as structural equation modeling (SEM). Design/methodology/approach This study was conducted in the construction industry in Tanzania....

全面介绍

Saved in:
书目详细资料
Main Authors: T.J., Deepak, Ponniah, Venishri
格式: Article
出版: Emerald Publishing Limited 2017
主题:
在线阅读:http://eprints.intimal.edu.my/830/
https://doi.org/10.1108/ECAM-09-2015-0145
https://doi.org/10.1108/ECAM-09-2015-0145
标签: 添加标签
没有标签, 成为第一个标记此记录!
id my-inti-eprints.830
record_format eprints
spelling my-inti-eprints.8302017-06-22T07:42:07Z http://eprints.intimal.edu.my/830/ Analysis of delays in Tanzanian construction industry: Transaction cost economics (TCE) and structural equation modeling (SEM) approach T.J., Deepak Ponniah, Venishri TH Building construction Purpose The purpose of this paper is twofold: first, to develop theoretical underpinnings using TCE, and second, to run the analysis using an advanced tool such as structural equation modeling (SEM). Design/methodology/approach This study was conducted in the construction industry in Tanzania. A questionnaire-based survey method was used. A total of 308 respondents participated in the study. The relationships between the cause and effect factors were analyzed using SEM. Findings The important findings are as follows:cost overrun can be explained by consultant-related and material-related factors; disputes can be explained by cost overrun; arbitration can be explained by consultant-related, cost overrun, and dispute factors; litigation can be explained by client-related, disputes, and arbitration factors; and abandonment can be explained by consultant-related, external-related, disputes, arbitration, and litigation factors. Originality/value The main contributions of this study are theoretical development and comprehensive analyses of “cause” and “effect” factors of delays in the construction industry. Emerald Publishing Limited 2017 Article PeerReviewed T.J., Deepak and Ponniah, Venishri (2017) Analysis of delays in Tanzanian construction industry: Transaction cost economics (TCE) and structural equation modeling (SEM) approach. Engineering, Construction and Architectural Management, 24 (2). pp. 308-325. ISSN 0969-9988 https://doi.org/10.1108/ECAM-09-2015-0145 https://doi.org/10.1108/ECAM-09-2015-0145
institution INTI International University
building INTI Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider INTI International University
content_source INTI Institutional Repository
url_provider http://eprints.intimal.edu.my
topic TH Building construction
spellingShingle TH Building construction
T.J., Deepak
Ponniah, Venishri
Analysis of delays in Tanzanian construction industry: Transaction cost economics (TCE) and structural equation modeling (SEM) approach
description Purpose The purpose of this paper is twofold: first, to develop theoretical underpinnings using TCE, and second, to run the analysis using an advanced tool such as structural equation modeling (SEM). Design/methodology/approach This study was conducted in the construction industry in Tanzania. A questionnaire-based survey method was used. A total of 308 respondents participated in the study. The relationships between the cause and effect factors were analyzed using SEM. Findings The important findings are as follows:cost overrun can be explained by consultant-related and material-related factors; disputes can be explained by cost overrun; arbitration can be explained by consultant-related, cost overrun, and dispute factors; litigation can be explained by client-related, disputes, and arbitration factors; and abandonment can be explained by consultant-related, external-related, disputes, arbitration, and litigation factors. Originality/value The main contributions of this study are theoretical development and comprehensive analyses of “cause” and “effect” factors of delays in the construction industry.
format Article
author T.J., Deepak
Ponniah, Venishri
author_facet T.J., Deepak
Ponniah, Venishri
author_sort T.J., Deepak
title Analysis of delays in Tanzanian construction industry: Transaction cost economics (TCE) and structural equation modeling (SEM) approach
title_short Analysis of delays in Tanzanian construction industry: Transaction cost economics (TCE) and structural equation modeling (SEM) approach
title_full Analysis of delays in Tanzanian construction industry: Transaction cost economics (TCE) and structural equation modeling (SEM) approach
title_fullStr Analysis of delays in Tanzanian construction industry: Transaction cost economics (TCE) and structural equation modeling (SEM) approach
title_full_unstemmed Analysis of delays in Tanzanian construction industry: Transaction cost economics (TCE) and structural equation modeling (SEM) approach
title_sort analysis of delays in tanzanian construction industry: transaction cost economics (tce) and structural equation modeling (sem) approach
publisher Emerald Publishing Limited
publishDate 2017
url http://eprints.intimal.edu.my/830/
https://doi.org/10.1108/ECAM-09-2015-0145
https://doi.org/10.1108/ECAM-09-2015-0145
_version_ 1644541315819503616
score 13.250246