Resolution to Walls Surfaces Condensation & Mould Growth Issue in an 24-hours Air Conditioned Room

Engineering Design Project is about enabling students to develop a set of skills in order to solve and complete an engineering problem. The whole process ¡s carried out on minimum supervision. There are a lot of factors in determining (he success of the project, this include time management, having...

Full description

Saved in:
Bibliographic Details
Main Authors: Ker, De Kuan, Ng, Samuel ShenqJye, Seow, Zhen Liang, Low, Shu Boey
Format: Thesis
Language:English
Published: 2015
Subjects:
Online Access:http://eprints.intimal.edu.my/116/1/BMEGI%20-%2056.pdf
http://eprints.intimal.edu.my/116/
Tags: Add Tag
No Tags, Be the first to tag this record!
Be the first to leave a comment!
You must be logged in first