Resolution to Walls Surfaces Condensation & Mould Growth Issue in an 24-hours Air Conditioned Room
Engineering Design Project is about enabling students to develop a set of skills in order to solve and complete an engineering problem. The whole process ¡s carried out on minimum supervision. There are a lot of factors in determining (he success of the project, this include time management, having...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2015
|
Subjects: | |
Online Access: | http://eprints.intimal.edu.my/116/1/BMEGI%20-%2056.pdf http://eprints.intimal.edu.my/116/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my-inti-eprints.116 |
---|---|
record_format |
eprints |
spelling |
my-inti-eprints.1162016-04-06T09:45:13Z http://eprints.intimal.edu.my/116/ Resolution to Walls Surfaces Condensation & Mould Growth Issue in an 24-hours Air Conditioned Room Ker, De Kuan Ng, Samuel ShenqJye Seow, Zhen Liang Low, Shu Boey TJ Mechanical engineering and machinery Engineering Design Project is about enabling students to develop a set of skills in order to solve and complete an engineering problem. The whole process ¡s carried out on minimum supervision. There are a lot of factors in determining (he success of the project, this include time management, having a clear objective, proposing multiple solutions, understanding the obtained results and many more. By getting hold of the objectives and as well as outcomes, a clear path of direction can be obtained. Both the skill to work as an individual as well as the skill to work as a group is put at stake. With the combination of both, a well-structured and complete project can be the output.� 2015 Thesis NonPeerReviewed text en http://eprints.intimal.edu.my/116/1/BMEGI%20-%2056.pdf Ker, De Kuan and Ng, Samuel ShenqJye and Seow, Zhen Liang and Low, Shu Boey (2015) Resolution to Walls Surfaces Condensation & Mould Growth Issue in an 24-hours Air Conditioned Room. Other thesis, INTI International University. |
institution |
INTI International University |
building |
INTI Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
INTI International University |
content_source |
INTI Institutional Repository |
url_provider |
http://eprints.intimal.edu.my |
language |
English |
topic |
TJ Mechanical engineering and machinery |
spellingShingle |
TJ Mechanical engineering and machinery Ker, De Kuan Ng, Samuel ShenqJye Seow, Zhen Liang Low, Shu Boey Resolution to Walls Surfaces Condensation & Mould Growth Issue in an 24-hours Air Conditioned Room |
description |
Engineering Design Project is about enabling students to develop a set of skills in order to solve and complete an engineering problem. The whole process ¡s carried out on minimum supervision. There are a lot of factors in determining (he success of the project, this include time management, having a clear objective, proposing multiple solutions, understanding the obtained results and many more. By getting hold of the objectives and as well as outcomes, a clear path of direction can be obtained. Both the skill to work as an individual as well as the skill to work as a group is put at stake. With the combination of both, a well-structured and complete project can be the output.� |
format |
Thesis |
author |
Ker, De Kuan Ng, Samuel ShenqJye Seow, Zhen Liang Low, Shu Boey |
author_facet |
Ker, De Kuan Ng, Samuel ShenqJye Seow, Zhen Liang Low, Shu Boey |
author_sort |
Ker, De Kuan |
title |
Resolution to Walls Surfaces Condensation & Mould Growth Issue in
an 24-hours Air Conditioned Room |
title_short |
Resolution to Walls Surfaces Condensation & Mould Growth Issue in
an 24-hours Air Conditioned Room |
title_full |
Resolution to Walls Surfaces Condensation & Mould Growth Issue in
an 24-hours Air Conditioned Room |
title_fullStr |
Resolution to Walls Surfaces Condensation & Mould Growth Issue in
an 24-hours Air Conditioned Room |
title_full_unstemmed |
Resolution to Walls Surfaces Condensation & Mould Growth Issue in
an 24-hours Air Conditioned Room |
title_sort |
resolution to walls surfaces condensation & mould growth issue in
an 24-hours air conditioned room |
publishDate |
2015 |
url |
http://eprints.intimal.edu.my/116/1/BMEGI%20-%2056.pdf http://eprints.intimal.edu.my/116/ |
_version_ |
1644541098512613376 |
score |
13.211869 |