FILL REMOVAL FROM HORIZONTAL WELLBORE USING FOAM IN COILED TUBING
Coiled tubing is extensively used in oil industry to clean the wellbore to increase the productivity of oil/gas well by removing the fill/sand downhole. Well cleanup operation for large diameter well with low bottomhole pressure is problematic and common cleanout fluids are not effective as a cir...
Saved in:
Main Author: | KHAN, JAVED AKBAR |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2014
|
Subjects: | |
Online Access: | http://utpedia.utp.edu.my/id/eprint/22779/1/2013-MECHANICAL-FILL%20REMOVAL%20FROM%20HORIZONTAL%20WELLBORE%20USING%20FOAM%20IN%20COILED%20TUBING-JAVED%20AKBAR%20KHAN.pdf http://utpedia.utp.edu.my/id/eprint/22779/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
FILL REMOVAL FROM HORIZONTAL WELLBORE USING FOAM IN COILED
TUBING
by: KHAN, JAVED AKBAR
Published: (2013) -
Fill Removal with Foam in Horizontal Well Cleaning in Coiled Tubing
by: Khan, Javed A, et al.
Published: (2013) -
Fill Removal in Wellbore Using Coiled Tubing
by: Yong, Lawrence Hao Peng
Published: (2012) -
Fill Removal in Wellbore Using Coiled Tubing
by: Yong, Lawrence H. P., et al.
Published: (2013) -
Fill removal in wellbore using coiled tubing
by: Yong, L.H.P., et al.
Published: (2013)