A PROPOSED LOAD SHEDDING SCHEME FOR EG LNG PLANT
This report presents a prepossessed methodology for a design of automatic under-frequency load shedding scheme. The network of Equatorial Guinea Liquefied Natural Gas Plant has been chosen for implementation. The project involves one main objective which is to design and implement, through simulatio...
Saved in:
Main Author: | |
---|---|
Format: | Final Year Project |
Language: | English |
Published: |
Universiti Teknologi Petronas
2010
|
Subjects: | |
Online Access: | http://utpedia.utp.edu.my/id/eprint/1082/1/felipe_nguema_eman_andeme.pdf http://utpedia.utp.edu.my/id/eprint/1082/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | This report presents a prepossessed methodology for a design of automatic under-frequency load shedding scheme. The network of Equatorial Guinea Liquefied Natural Gas Plant has been chosen for implementation. The project involves one main objective which is to design and implement, through simulation, an automatic load shedding scheme suitable for the network. The plant load is divided into different categories. |
---|