Managing Process Hazards in Lab-scale Pilot Plant for Safe Operation

Injuries, accidents or even fatalities due to direct exposure of process hazards while working in the pilot plant are reported worldwide. As real test room, pilot plant contains unique and critical hazards which reflect both the variety and the scale of their operations. Many institutions may have t...

Full description

Saved in:
Bibliographic Details
Main Authors: Abdul Aziz, Hanida, Mohd Shariff, Azmi, Roslan, Mohd Rafizie
Format: Conference or Workshop Item
Published: 2011
Subjects:
Online Access:http://scholars.utp.edu.my/id/eprint/7617/
Tags: Add Tag
No Tags, Be the first to tag this record!
id oai:scholars.utp.edu.my:7617
record_format eprints
spelling oai:scholars.utp.edu.my:76172023-04-11T04:28:54Z http://scholars.utp.edu.my/id/eprint/7617/ Managing Process Hazards in Lab-scale Pilot Plant for Safe Operation Abdul Aziz, Hanida Mohd Shariff, Azmi Roslan, Mohd Rafizie QD Chemistry Injuries, accidents or even fatalities due to direct exposure of process hazards while working in the pilot plant are reported worldwide. As real test room, pilot plant contains unique and critical hazards which reflect both the variety and the scale of their operations. Many institutions may have the internal guidelines for controlling hazards or risk in chemical laboratories including pilot plant such as Chemical Hygiene Plan (CHP). However, the required approach to manage this process hazards is not same. It is highly notice such internal guidelines may have limitation to manage process hazards in pilot plant. Therefore, a new systematic approach should be introduced to increase safe operations and prevent accident injuries, fatalities and properties damage at pilot plant .One of the promising standard that could address this issue is Process Hazard Analysis (PHA) of OSHA Process Safety Management (PSM) CFR 1910.119(e). This paper presents a framework of Process Hazard Management for Lab-Scale Pilot Plant (PHM-LabPP) following the CFR 1910.119(e) standard. PHM-LabPP was successfully implemented at High Gravitational Natural Gas pilot plant as a case study. PHM-LabPP is easy to implement, effectively manage the process hazards and ensure safe operation of pilot plant through systematic monitoring of the corrective actions. 2011 Conference or Workshop Item PeerReviewed Abdul Aziz, Hanida and Mohd Shariff, Azmi and Roslan, Mohd Rafizie (2011) Managing Process Hazards in Lab-scale Pilot Plant for Safe Operation. In: United Kingdom-Malaysia-Ireland Engineering Science Conference (UMIEST2011), 12th -14th July 2011, Kuala Lumpur, Malaysia.
institution Universiti Teknologi Petronas
building UTP Resource Centre
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Petronas
content_source UTP Institutional Repository
url_provider http://eprints.utp.edu.my/
topic QD Chemistry
spellingShingle QD Chemistry
Abdul Aziz, Hanida
Mohd Shariff, Azmi
Roslan, Mohd Rafizie
Managing Process Hazards in Lab-scale Pilot Plant for Safe Operation
description Injuries, accidents or even fatalities due to direct exposure of process hazards while working in the pilot plant are reported worldwide. As real test room, pilot plant contains unique and critical hazards which reflect both the variety and the scale of their operations. Many institutions may have the internal guidelines for controlling hazards or risk in chemical laboratories including pilot plant such as Chemical Hygiene Plan (CHP). However, the required approach to manage this process hazards is not same. It is highly notice such internal guidelines may have limitation to manage process hazards in pilot plant. Therefore, a new systematic approach should be introduced to increase safe operations and prevent accident injuries, fatalities and properties damage at pilot plant .One of the promising standard that could address this issue is Process Hazard Analysis (PHA) of OSHA Process Safety Management (PSM) CFR 1910.119(e). This paper presents a framework of Process Hazard Management for Lab-Scale Pilot Plant (PHM-LabPP) following the CFR 1910.119(e) standard. PHM-LabPP was successfully implemented at High Gravitational Natural Gas pilot plant as a case study. PHM-LabPP is easy to implement, effectively manage the process hazards and ensure safe operation of pilot plant through systematic monitoring of the corrective actions.
format Conference or Workshop Item
author Abdul Aziz, Hanida
Mohd Shariff, Azmi
Roslan, Mohd Rafizie
author_facet Abdul Aziz, Hanida
Mohd Shariff, Azmi
Roslan, Mohd Rafizie
author_sort Abdul Aziz, Hanida
title Managing Process Hazards in Lab-scale Pilot Plant for Safe Operation
title_short Managing Process Hazards in Lab-scale Pilot Plant for Safe Operation
title_full Managing Process Hazards in Lab-scale Pilot Plant for Safe Operation
title_fullStr Managing Process Hazards in Lab-scale Pilot Plant for Safe Operation
title_full_unstemmed Managing Process Hazards in Lab-scale Pilot Plant for Safe Operation
title_sort managing process hazards in lab-scale pilot plant for safe operation
publishDate 2011
url http://scholars.utp.edu.my/id/eprint/7617/
_version_ 1762964052855750656
score 13.214268