Automated monitoring technologies and construction productivity enhancement: Building projects case
Monitoring the construction productivity (CP) is significant for the success of construction projects as it helps to assess the project performance. This study aims to investigate the relation between automated monitoring (AM) technologies and CP enhancement. To achieve this, the different AM techno...
Saved in:
Main Authors: | , , , , , |
---|---|
Format: | Article |
Published: |
Ain Shams University
2023
|
Online Access: | http://scholars.utp.edu.my/id/eprint/37473/ https://www.scopus.com/inward/record.uri?eid=2-s2.0-85141978867&doi=10.1016%2fj.asej.2022.102042&partnerID=40&md5=177f0b7f66b6749081ba45c8ff826e82 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
oai:scholars.utp.edu.my:37473 |
---|---|
record_format |
eprints |
spelling |
oai:scholars.utp.edu.my:374732023-10-04T13:17:29Z http://scholars.utp.edu.my/id/eprint/37473/ Automated monitoring technologies and construction productivity enhancement: Building projects case Mhmoud Alzubi, K. Salah Alaloul, W. Malkawi, A.B. Al Salaheen, M. Hannan Qureshi, A. Ali Musarat, M. Monitoring the construction productivity (CP) is significant for the success of construction projects as it helps to assess the project performance. This study aims to investigate the relation between automated monitoring (AM) technologies and CP enhancement. To achieve this, the different AM technologies that are used for monitoring in building projects, factors affecting CP, and factors of CP that can be monitored using AM were investigated and prioritized. A mixed methodology including a systematic review and analytic hierarchy process was adopted. Results provide that; CP factors can be detected and enhanced effectively by monitoring CP. Among the adopted AM technologies, vision-based (37) is the most effective one in monitoring CP. While workforce factors are the most important factors affecting CP. Also, in terms of factors monitored using AM technologies, factors within the workforce category come in the first place. Consonantly, it is rational to focus on monitoring these factors to enhance CP. © 2022 THE AUTHORS Ain Shams University 2023 Article NonPeerReviewed Mhmoud Alzubi, K. and Salah Alaloul, W. and Malkawi, A.B. and Al Salaheen, M. and Hannan Qureshi, A. and Ali Musarat, M. (2023) Automated monitoring technologies and construction productivity enhancement: Building projects case. Ain Shams Engineering Journal, 14 (8). ISSN 20904479 https://www.scopus.com/inward/record.uri?eid=2-s2.0-85141978867&doi=10.1016%2fj.asej.2022.102042&partnerID=40&md5=177f0b7f66b6749081ba45c8ff826e82 10.1016/j.asej.2022.102042 10.1016/j.asej.2022.102042 10.1016/j.asej.2022.102042 |
institution |
Universiti Teknologi Petronas |
building |
UTP Resource Centre |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Petronas |
content_source |
UTP Institutional Repository |
url_provider |
http://eprints.utp.edu.my/ |
description |
Monitoring the construction productivity (CP) is significant for the success of construction projects as it helps to assess the project performance. This study aims to investigate the relation between automated monitoring (AM) technologies and CP enhancement. To achieve this, the different AM technologies that are used for monitoring in building projects, factors affecting CP, and factors of CP that can be monitored using AM were investigated and prioritized. A mixed methodology including a systematic review and analytic hierarchy process was adopted. Results provide that; CP factors can be detected and enhanced effectively by monitoring CP. Among the adopted AM technologies, vision-based (37) is the most effective one in monitoring CP. While workforce factors are the most important factors affecting CP. Also, in terms of factors monitored using AM technologies, factors within the workforce category come in the first place. Consonantly, it is rational to focus on monitoring these factors to enhance CP. © 2022 THE AUTHORS |
format |
Article |
author |
Mhmoud Alzubi, K. Salah Alaloul, W. Malkawi, A.B. Al Salaheen, M. Hannan Qureshi, A. Ali Musarat, M. |
spellingShingle |
Mhmoud Alzubi, K. Salah Alaloul, W. Malkawi, A.B. Al Salaheen, M. Hannan Qureshi, A. Ali Musarat, M. Automated monitoring technologies and construction productivity enhancement: Building projects case |
author_facet |
Mhmoud Alzubi, K. Salah Alaloul, W. Malkawi, A.B. Al Salaheen, M. Hannan Qureshi, A. Ali Musarat, M. |
author_sort |
Mhmoud Alzubi, K. |
title |
Automated monitoring technologies and construction productivity enhancement: Building projects case |
title_short |
Automated monitoring technologies and construction productivity enhancement: Building projects case |
title_full |
Automated monitoring technologies and construction productivity enhancement: Building projects case |
title_fullStr |
Automated monitoring technologies and construction productivity enhancement: Building projects case |
title_full_unstemmed |
Automated monitoring technologies and construction productivity enhancement: Building projects case |
title_sort |
automated monitoring technologies and construction productivity enhancement: building projects case |
publisher |
Ain Shams University |
publishDate |
2023 |
url |
http://scholars.utp.edu.my/id/eprint/37473/ https://www.scopus.com/inward/record.uri?eid=2-s2.0-85141978867&doi=10.1016%2fj.asej.2022.102042&partnerID=40&md5=177f0b7f66b6749081ba45c8ff826e82 |
_version_ |
1779441388569493504 |
score |
13.214268 |