Major blocking factors affecting the application of industrialized building system
Industrialized construction continues to emerge globally. Developing countries like Malaysia are still unable to increase industrialized building system (IBS) implementation significantly, demonstrated by the low IBS percentage of less than 3. Therefore, this research aims to determine the factors b...
Saved in:
Main Authors: | , , , , , , |
---|---|
Format: | Article |
Published: |
Ain Shams University
2023
|
Online Access: | http://scholars.utp.edu.my/id/eprint/37346/ https://www.scopus.com/inward/record.uri?eid=2-s2.0-85146579968&doi=10.1016%2fj.asej.2023.102151&partnerID=40&md5=7b96a97483a3dc920cb9085e9f98a4a3 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
oai:scholars.utp.edu.my:37346 |
---|---|
record_format |
eprints |
spelling |
oai:scholars.utp.edu.my:373462023-10-04T08:42:14Z http://scholars.utp.edu.my/id/eprint/37346/ Major blocking factors affecting the application of industrialized building system Al-Aidrous, A.-H.M.H. Shafiq, N. Rahmawati, Y. Mohammed, B.S. Al-Ashmori, Y.Y. Baarimah, A.O. Alawag, A.M. Industrialized construction continues to emerge globally. Developing countries like Malaysia are still unable to increase industrialized building system (IBS) implementation significantly, demonstrated by the low IBS percentage of less than 3. Therefore, this research aims to determine the factors blocking IBS implementation through a mixed-methodological approach in the Malaysian construction industry. Using the data collected from 219 valid questionnaire responses, several statistical analyses were performed. Factor analysis was used to categorize the 25 factors into six main groups namely: �financial concerns,� �ineffective policies,� �technical and management worries,� �traditional stakeholders� concerns,� �design restrictions� and �negative perception�. The top three critical factors are high initial capital cost, high initial cost of customized design, and transportation cost. Hence, adopting an innovative standardized design concept and increasing IBS manufacturers nationwide are recommended. The findings provide a useful guide to critical blocking factors and, thus, develop feasible solutions to achieve successful implementation of industrialized buildings. © 2023 THE AUTHORS Ain Shams University 2023 Article NonPeerReviewed Al-Aidrous, A.-H.M.H. and Shafiq, N. and Rahmawati, Y. and Mohammed, B.S. and Al-Ashmori, Y.Y. and Baarimah, A.O. and Alawag, A.M. (2023) Major blocking factors affecting the application of industrialized building system. Ain Shams Engineering Journal, 14 (10). ISSN 20904479 https://www.scopus.com/inward/record.uri?eid=2-s2.0-85146579968&doi=10.1016%2fj.asej.2023.102151&partnerID=40&md5=7b96a97483a3dc920cb9085e9f98a4a3 10.1016/j.asej.2023.102151 10.1016/j.asej.2023.102151 10.1016/j.asej.2023.102151 |
institution |
Universiti Teknologi Petronas |
building |
UTP Resource Centre |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Petronas |
content_source |
UTP Institutional Repository |
url_provider |
http://eprints.utp.edu.my/ |
description |
Industrialized construction continues to emerge globally. Developing countries like Malaysia are still unable to increase industrialized building system (IBS) implementation significantly, demonstrated by the low IBS percentage of less than 3. Therefore, this research aims to determine the factors blocking IBS implementation through a mixed-methodological approach in the Malaysian construction industry. Using the data collected from 219 valid questionnaire responses, several statistical analyses were performed. Factor analysis was used to categorize the 25 factors into six main groups namely: �financial concerns,� �ineffective policies,� �technical and management worries,� �traditional stakeholders� concerns,� �design restrictions� and �negative perception�. The top three critical factors are high initial capital cost, high initial cost of customized design, and transportation cost. Hence, adopting an innovative standardized design concept and increasing IBS manufacturers nationwide are recommended. The findings provide a useful guide to critical blocking factors and, thus, develop feasible solutions to achieve successful implementation of industrialized buildings. © 2023 THE AUTHORS |
format |
Article |
author |
Al-Aidrous, A.-H.M.H. Shafiq, N. Rahmawati, Y. Mohammed, B.S. Al-Ashmori, Y.Y. Baarimah, A.O. Alawag, A.M. |
spellingShingle |
Al-Aidrous, A.-H.M.H. Shafiq, N. Rahmawati, Y. Mohammed, B.S. Al-Ashmori, Y.Y. Baarimah, A.O. Alawag, A.M. Major blocking factors affecting the application of industrialized building system |
author_facet |
Al-Aidrous, A.-H.M.H. Shafiq, N. Rahmawati, Y. Mohammed, B.S. Al-Ashmori, Y.Y. Baarimah, A.O. Alawag, A.M. |
author_sort |
Al-Aidrous, A.-H.M.H. |
title |
Major blocking factors affecting the application of industrialized building system |
title_short |
Major blocking factors affecting the application of industrialized building system |
title_full |
Major blocking factors affecting the application of industrialized building system |
title_fullStr |
Major blocking factors affecting the application of industrialized building system |
title_full_unstemmed |
Major blocking factors affecting the application of industrialized building system |
title_sort |
major blocking factors affecting the application of industrialized building system |
publisher |
Ain Shams University |
publishDate |
2023 |
url |
http://scholars.utp.edu.my/id/eprint/37346/ https://www.scopus.com/inward/record.uri?eid=2-s2.0-85146579968&doi=10.1016%2fj.asej.2023.102151&partnerID=40&md5=7b96a97483a3dc920cb9085e9f98a4a3 |
_version_ |
1779441368876187648 |
score |
13.214268 |