Last Planner System (LPS) Themed Framework for Effective Application of Industrialized Building System (IBS)

The industrialized building system (IBS) is a modern technology that may advance the construction industry. In various domains, conventional construction methodologies are being replaced by IBS to meet growing market demand sustainably. The Malaysian government has successfully started implementing...

Full description

Saved in:
Bibliographic Details
Main Authors: Alaloul, W.S., Heng, L.J., Qureshi, A.H.
Format: Article
Published: Institute for Ionics 2023
Online Access:http://scholars.utp.edu.my/id/eprint/37344/
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85151319704&doi=10.1007%2fs13369-023-07793-x&partnerID=40&md5=89960d2d24ead40d8822fdb43e0d1afa
Tags: Add Tag
No Tags, Be the first to tag this record!
id oai:scholars.utp.edu.my:37344
record_format eprints
spelling oai:scholars.utp.edu.my:373442023-10-04T08:42:10Z http://scholars.utp.edu.my/id/eprint/37344/ Last Planner System (LPS) Themed Framework for Effective Application of Industrialized Building System (IBS) Alaloul, W.S. Heng, L.J. Qureshi, A.H. The industrialized building system (IBS) is a modern technology that may advance the construction industry. In various domains, conventional construction methodologies are being replaced by IBS to meet growing market demand sustainably. The Malaysian government has successfully started implementing IBS in the public sector. However, the private sector is hesitant about its adoption. Last planner system (LPS) is a realistic way to collaboratively manage project-based production that involves trade foremen or design team leaders (the last planners) in planning in greater and greater detail as the time for the work to be done gets closer. This study identified the critical success factors (CSFs) of IBS adoption using a questionnaire survey distributed among the IBS stakeholders, contractors, consultants and academicians. After that, a conceptual framework was developed for adopting IBS in Malaysia based on the LPS via analytical hierarchy process. The results display the importance level of each CSFs by their criteria weight according to master planning, phase planning, make-ready planning, weekly planning and learning phase in LPS. © 2023, King Fahd University of Petroleum & Minerals. Institute for Ionics 2023 Article NonPeerReviewed Alaloul, W.S. and Heng, L.J. and Qureshi, A.H. (2023) Last Planner System (LPS) Themed Framework for Effective Application of Industrialized Building System (IBS). Arabian Journal for Science and Engineering, 48 (10). pp. 13377-13393. ISSN 2193567X https://www.scopus.com/inward/record.uri?eid=2-s2.0-85151319704&doi=10.1007%2fs13369-023-07793-x&partnerID=40&md5=89960d2d24ead40d8822fdb43e0d1afa 10.1007/s13369-023-07793-x 10.1007/s13369-023-07793-x 10.1007/s13369-023-07793-x
institution Universiti Teknologi Petronas
building UTP Resource Centre
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Petronas
content_source UTP Institutional Repository
url_provider http://eprints.utp.edu.my/
description The industrialized building system (IBS) is a modern technology that may advance the construction industry. In various domains, conventional construction methodologies are being replaced by IBS to meet growing market demand sustainably. The Malaysian government has successfully started implementing IBS in the public sector. However, the private sector is hesitant about its adoption. Last planner system (LPS) is a realistic way to collaboratively manage project-based production that involves trade foremen or design team leaders (the last planners) in planning in greater and greater detail as the time for the work to be done gets closer. This study identified the critical success factors (CSFs) of IBS adoption using a questionnaire survey distributed among the IBS stakeholders, contractors, consultants and academicians. After that, a conceptual framework was developed for adopting IBS in Malaysia based on the LPS via analytical hierarchy process. The results display the importance level of each CSFs by their criteria weight according to master planning, phase planning, make-ready planning, weekly planning and learning phase in LPS. © 2023, King Fahd University of Petroleum & Minerals.
format Article
author Alaloul, W.S.
Heng, L.J.
Qureshi, A.H.
spellingShingle Alaloul, W.S.
Heng, L.J.
Qureshi, A.H.
Last Planner System (LPS) Themed Framework for Effective Application of Industrialized Building System (IBS)
author_facet Alaloul, W.S.
Heng, L.J.
Qureshi, A.H.
author_sort Alaloul, W.S.
title Last Planner System (LPS) Themed Framework for Effective Application of Industrialized Building System (IBS)
title_short Last Planner System (LPS) Themed Framework for Effective Application of Industrialized Building System (IBS)
title_full Last Planner System (LPS) Themed Framework for Effective Application of Industrialized Building System (IBS)
title_fullStr Last Planner System (LPS) Themed Framework for Effective Application of Industrialized Building System (IBS)
title_full_unstemmed Last Planner System (LPS) Themed Framework for Effective Application of Industrialized Building System (IBS)
title_sort last planner system (lps) themed framework for effective application of industrialized building system (ibs)
publisher Institute for Ionics
publishDate 2023
url http://scholars.utp.edu.my/id/eprint/37344/
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85151319704&doi=10.1007%2fs13369-023-07793-x&partnerID=40&md5=89960d2d24ead40d8822fdb43e0d1afa
_version_ 1779441368588877824
score 13.18916