Analysis on Part Load Performance of EC Operations at District Cooling Plant

Electric chillers (EC) that are installed at District cooling (DC) plants are designed for charging thermal energy storage (TES) during off peak period.The stored chilled water in the TES is used to support the demand of chilled water during peak period.This is the case of EC at Universiti Teknologi...

Full description

Saved in:
Bibliographic Details
Main Authors: Abd Majid, M.A., Muhammad, M., Sasaki, T., Amar Mokhtar, A.
Format: Article
Published: 2023
Online Access:http://scholars.utp.edu.my/id/eprint/34202/
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85140764590&doi=10.1007%2f978-981-19-1939-8_7&partnerID=40&md5=9130ac251879d82f54047b7ea8d2a338
Tags: Add Tag
No Tags, Be the first to tag this record!
id oai:scholars.utp.edu.my:34202
record_format eprints
spelling oai:scholars.utp.edu.my:342022023-01-04T02:51:53Z http://scholars.utp.edu.my/id/eprint/34202/ Analysis on Part Load Performance of EC Operations at District Cooling Plant Abd Majid, M.A. Muhammad, M. Sasaki, T. Amar Mokhtar, A. Electric chillers (EC) that are installed at District cooling (DC) plants are designed for charging thermal energy storage (TES) during off peak period.The stored chilled water in the TES is used to support the demand of chilled water during peak period.This is the case of EC at Universiti Teknologi PETRONAS (UTP) DC plant due to insufficient supply of chilled water (CW) from steam absorption chillers (SAC) and TES.At the same time, the EC were also operated during the day time to support the demand of CW during peak timeand this was not per design.This led to EC were being operated at partial load.This study is on partial load operations of EC at the plant during year 2016 and 2017 covering four EC, each with 325 RT capacity.The main function of the ECs was to charge the TES during off peak period.Cases arise EC were also operated during the day.This resulted to EC were not being operated at full load.They were operated at partial load.This study is to determine the part load performance of EC operated under these conditions.Historical data was used for the study.Findings indicate most of the time EC were operated at about 10 h during the day. © 2023, Institute of Technology PETRONAS Sdn Bhd. 2023 Article NonPeerReviewed Abd Majid, M.A. and Muhammad, M. and Sasaki, T. and Amar Mokhtar, A. (2023) Analysis on Part Load Performance of EC Operations at District Cooling Plant. Lecture Notes in Mechanical Engineering. pp. 65-78. https://www.scopus.com/inward/record.uri?eid=2-s2.0-85140764590&doi=10.1007%2f978-981-19-1939-8_7&partnerID=40&md5=9130ac251879d82f54047b7ea8d2a338 10.1007/978-981-19-1939-8₇ 10.1007/978-981-19-1939-8₇
institution Universiti Teknologi Petronas
building UTP Resource Centre
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Petronas
content_source UTP Institutional Repository
url_provider http://eprints.utp.edu.my/
description Electric chillers (EC) that are installed at District cooling (DC) plants are designed for charging thermal energy storage (TES) during off peak period.The stored chilled water in the TES is used to support the demand of chilled water during peak period.This is the case of EC at Universiti Teknologi PETRONAS (UTP) DC plant due to insufficient supply of chilled water (CW) from steam absorption chillers (SAC) and TES.At the same time, the EC were also operated during the day time to support the demand of CW during peak timeand this was not per design.This led to EC were being operated at partial load.This study is on partial load operations of EC at the plant during year 2016 and 2017 covering four EC, each with 325 RT capacity.The main function of the ECs was to charge the TES during off peak period.Cases arise EC were also operated during the day.This resulted to EC were not being operated at full load.They were operated at partial load.This study is to determine the part load performance of EC operated under these conditions.Historical data was used for the study.Findings indicate most of the time EC were operated at about 10 h during the day. © 2023, Institute of Technology PETRONAS Sdn Bhd.
format Article
author Abd Majid, M.A.
Muhammad, M.
Sasaki, T.
Amar Mokhtar, A.
spellingShingle Abd Majid, M.A.
Muhammad, M.
Sasaki, T.
Amar Mokhtar, A.
Analysis on Part Load Performance of EC Operations at District Cooling Plant
author_facet Abd Majid, M.A.
Muhammad, M.
Sasaki, T.
Amar Mokhtar, A.
author_sort Abd Majid, M.A.
title Analysis on Part Load Performance of EC Operations at District Cooling Plant
title_short Analysis on Part Load Performance of EC Operations at District Cooling Plant
title_full Analysis on Part Load Performance of EC Operations at District Cooling Plant
title_fullStr Analysis on Part Load Performance of EC Operations at District Cooling Plant
title_full_unstemmed Analysis on Part Load Performance of EC Operations at District Cooling Plant
title_sort analysis on part load performance of ec operations at district cooling plant
publishDate 2023
url http://scholars.utp.edu.my/id/eprint/34202/
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85140764590&doi=10.1007%2f978-981-19-1939-8_7&partnerID=40&md5=9130ac251879d82f54047b7ea8d2a338
_version_ 1754532141223378944
score 13.214268