An algorithm model for solving the single-period inventory transportation problems in the construction industry
An algorithm model for solving the single-period inventory transportation problems in the construction industry by Mohd Kamarul Irwan Abdul Rahim
Saved in:
Main Author: | Mohd Kamarul Irwan Abdul Rahim |
---|---|
Format: | article |
Language: | English |
Published: |
Tanjong Malim
2020
|
Online Access: | https://ir.upsi.edu.my/detailsg.php?det=6200 https://ir.upsi.edu.my/detailsg.php?det=6200 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
An algorithm model for solving the single-period
inventory transportation problems in the construction industry
by: Abdul Rahim, Mohd Kamarul Irwan, et al.
Published: (2020) -
An Algorithm Model for Solving the Single-Period Inventory Transportation Problems in the Construction Industry
by: Abdul Rahim, Mohd Kamarul Irwan, et al.
Published: (2020) -
An Algorithm Study for Modeling the Multi-Period Inventory Transportation Problem in Construction Industry (S/O 14585)
by: Yaakob, Mazri, et al.
Published: (2021) -
A Single Period Deterministic Inventory Routing Model for Solving
Problems in the Agriculture Industry
by: Muhammad Khodri Harahap, Afif Zuhri, et al.
Published: (2022) -
The integrated model for solving the single-period deterministic inventory routing problem
by: Abdul Rahim, Mohd Kamarul Irwan, et al.
Published: (2016)