A Strategy Towards Team Integration Practice for Improving the Design and Construction Process in the Malaysian Industrialized Building System Projects

The Malaysian construction industry has been urged to change from using a conventional method to industrialized building system (IBS) to attain, (1) better build quality and productivity, (2) reduce risks related to occupational safety and health, (3) alleviate issues for skilled workers and depende...

Full description

Saved in:
Bibliographic Details
Main Authors: Othman, Mohd Zainudin, Mohd Nawi, Mohd Nasrun, Abdul Nifa, Faizatul Akmar, Yaakob, Mazri, Rofie, Mohamad Khadafi, Md Zan, Zainal, Ahmad Pozin, Mohd Affendi
Format: Article
Language:English
Published: EconJournals 2016
Subjects:
Online Access:https://repo.uum.edu.my/id/eprint/31621/1/IRMM%2006%20S08%20226-229%202016.pdf
https://repo.uum.edu.my/id/eprint/31621/
https://econjournals.com/index.php/irmm/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uum.repo.31621
record_format eprints
spelling my.uum.repo.316212024-12-16T15:44:02Z https://repo.uum.edu.my/id/eprint/31621/ A Strategy Towards Team Integration Practice for Improving the Design and Construction Process in the Malaysian Industrialized Building System Projects Othman, Mohd Zainudin Mohd Nawi, Mohd Nasrun Abdul Nifa, Faizatul Akmar Yaakob, Mazri Rofie, Mohamad Khadafi Md Zan, Zainal Ahmad Pozin, Mohd Affendi HD28 Management. Industrial Management The Malaysian construction industry has been urged to change from using a conventional method to industrialized building system (IBS) to attain, (1) better build quality and productivity, (2) reduce risks related to occupational safety and health, (3) alleviate issues for skilled workers and dependency on manual foreign labor, and (4) achieve the ultimate goal of reducing the overall cost of construction. Despite acknowledging its benefits, the construction industry is still not rapidly embracing IBS. This is mainly due to its traditional and conservative nature where anything new or different, faces implementation barriers. An investigation by some researchers identified that one of the main obstacles to IBS implementation in the Malaysian construction industry is related to poor integration among stakeholders involved during the design stage. Responding to the issue above, this research aims to counter this problem and help towards the betterment of the IBS Malaysian construction industry using an integrated design team delivery approach. Therefore, this paper discusses a strategy by the identifying key factors that are pertinent to improving the integration of design and construction activities and summarizes the recommendations from multiple case studies on the key factors towards effective integrated design team delivery EconJournals 2016 Article PeerReviewed application/pdf en cc4_by_nc_nd https://repo.uum.edu.my/id/eprint/31621/1/IRMM%2006%20S08%20226-229%202016.pdf Othman, Mohd Zainudin and Mohd Nawi, Mohd Nasrun and Abdul Nifa, Faizatul Akmar and Yaakob, Mazri and Rofie, Mohamad Khadafi and Md Zan, Zainal and Ahmad Pozin, Mohd Affendi (2016) A Strategy Towards Team Integration Practice for Improving the Design and Construction Process in the Malaysian Industrialized Building System Projects. International Review of Management and Marketing, 6 (8). pp. 226-229. ISSN 2146-4405 https://econjournals.com/index.php/irmm/
institution Universiti Utara Malaysia
building UUM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Utara Malaysia
content_source UUM Institutional Repository
url_provider http://repo.uum.edu.my/
language English
topic HD28 Management. Industrial Management
spellingShingle HD28 Management. Industrial Management
Othman, Mohd Zainudin
Mohd Nawi, Mohd Nasrun
Abdul Nifa, Faizatul Akmar
Yaakob, Mazri
Rofie, Mohamad Khadafi
Md Zan, Zainal
Ahmad Pozin, Mohd Affendi
A Strategy Towards Team Integration Practice for Improving the Design and Construction Process in the Malaysian Industrialized Building System Projects
description The Malaysian construction industry has been urged to change from using a conventional method to industrialized building system (IBS) to attain, (1) better build quality and productivity, (2) reduce risks related to occupational safety and health, (3) alleviate issues for skilled workers and dependency on manual foreign labor, and (4) achieve the ultimate goal of reducing the overall cost of construction. Despite acknowledging its benefits, the construction industry is still not rapidly embracing IBS. This is mainly due to its traditional and conservative nature where anything new or different, faces implementation barriers. An investigation by some researchers identified that one of the main obstacles to IBS implementation in the Malaysian construction industry is related to poor integration among stakeholders involved during the design stage. Responding to the issue above, this research aims to counter this problem and help towards the betterment of the IBS Malaysian construction industry using an integrated design team delivery approach. Therefore, this paper discusses a strategy by the identifying key factors that are pertinent to improving the integration of design and construction activities and summarizes the recommendations from multiple case studies on the key factors towards effective integrated design team delivery
format Article
author Othman, Mohd Zainudin
Mohd Nawi, Mohd Nasrun
Abdul Nifa, Faizatul Akmar
Yaakob, Mazri
Rofie, Mohamad Khadafi
Md Zan, Zainal
Ahmad Pozin, Mohd Affendi
author_facet Othman, Mohd Zainudin
Mohd Nawi, Mohd Nasrun
Abdul Nifa, Faizatul Akmar
Yaakob, Mazri
Rofie, Mohamad Khadafi
Md Zan, Zainal
Ahmad Pozin, Mohd Affendi
author_sort Othman, Mohd Zainudin
title A Strategy Towards Team Integration Practice for Improving the Design and Construction Process in the Malaysian Industrialized Building System Projects
title_short A Strategy Towards Team Integration Practice for Improving the Design and Construction Process in the Malaysian Industrialized Building System Projects
title_full A Strategy Towards Team Integration Practice for Improving the Design and Construction Process in the Malaysian Industrialized Building System Projects
title_fullStr A Strategy Towards Team Integration Practice for Improving the Design and Construction Process in the Malaysian Industrialized Building System Projects
title_full_unstemmed A Strategy Towards Team Integration Practice for Improving the Design and Construction Process in the Malaysian Industrialized Building System Projects
title_sort strategy towards team integration practice for improving the design and construction process in the malaysian industrialized building system projects
publisher EconJournals
publishDate 2016
url https://repo.uum.edu.my/id/eprint/31621/1/IRMM%2006%20S08%20226-229%202016.pdf
https://repo.uum.edu.my/id/eprint/31621/
https://econjournals.com/index.php/irmm/
_version_ 1818837620381188096
score 13.223943