Effect of Manpower Factor on Semiautomatic Production Line Completion Time: A System Dynamics Approach

Completion time in a manufacturing sector is the time required to complete a product in sequence process during production operation. In a semiautomatic production line, manpower factors such as fatigue and pressure are two significant influences on completion time. However, it is found that previou...

Full description

Saved in:
Bibliographic Details
Main Authors: Ahmarofi, Ahmad Afif, Abidin, N. Z., Ramli, Razamin
Format: Article
Language:English
Published: UMP Publisher 2017
Subjects:
Online Access:https://repo.uum.edu.my/id/eprint/31022/1/JMES%2011%2002%202017%202567-2580.pdf
https://doi.org/10.15282/jmes.11.2.2017.1.0235
https://repo.uum.edu.my/id/eprint/31022/
https://jmes.umpsa.edu.my/images/5_Azaini%20and%20Masngut.pdf
https://doi.org/10.15282/jmes.11.2.2017.1.0235
Tags: Add Tag
No Tags, Be the first to tag this record!