Effect of Manpower Factor on Semiautomatic Production Line Completion Time: A System Dynamics Approach
Completion time in a manufacturing sector is the time required to complete a product in sequence process during production operation. In a semiautomatic production line, manpower factors such as fatigue and pressure are two significant influences on completion time. However, it is found that previou...
Saved in:
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
UMP Publisher
2017
|
Subjects: | |
Online Access: | https://repo.uum.edu.my/id/eprint/31022/1/JMES%2011%2002%202017%202567-2580.pdf https://doi.org/10.15282/jmes.11.2.2017.1.0235 https://repo.uum.edu.my/id/eprint/31022/ https://jmes.umpsa.edu.my/images/5_Azaini%20and%20Masngut.pdf https://doi.org/10.15282/jmes.11.2.2017.1.0235 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|