The Effective Project Management Approach Towards Minimising Environmental Impacts in The Construction Industry

One factor in a nation’s successful economic growth and social well-being is the construction industry. Regrettably, the construction industry is also associated with a range of environmental impacts, including air pollution, noise pollution, soil contamination, and other related problems. The const...

Full description

Saved in:
Bibliographic Details
Main Authors: Ismail, Radzi, Othmani, Muhammad Izzat, Said, Ilias, Dan, Wang
Format: Article
Language:English
Published: UUM Press 2023
Subjects:
Online Access:https://repo.uum.edu.my/id/eprint/30243/1/JTOM%2018%2002%202023%2060-72.pdf
https://doi.org/10.32890/jtom2023.18.2.5
https://repo.uum.edu.my/id/eprint/30243/
https://e-journal.uum.edu.my/index.php/jtom/article/view/22030
https://doi.org/10.32890/jtom2023.18.2.5
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uum.repo.30243
record_format eprints
spelling my.uum.repo.302432024-01-16T08:16:41Z https://repo.uum.edu.my/id/eprint/30243/ The Effective Project Management Approach Towards Minimising Environmental Impacts in The Construction Industry Ismail, Radzi Othmani, Muhammad Izzat Said, Ilias Dan, Wang HD28 Management. Industrial Management One factor in a nation’s successful economic growth and social well-being is the construction industry. Regrettably, the construction industry is also associated with a range of environmental impacts, including air pollution, noise pollution, soil contamination, and other related problems. The construction activities will have a detrimental environmental effect, significantly impacting the comfort and quality of life of individuals, particularly in urban regions like Klang Valey, Malaysia, where the pace of development is very rapid. However, project management approaches in construction projects can efficiently reduce adverse environmental impacts. Nevertheless, the adoption of project management approaches in construction projects, particularly in medium to small scale ones, remains significantly low. Although the use of project management has numerous advantages, it also presents significant hurdles for construction professionals in efficiently incorporating it into their professions, particularly in Klang Valley. Therefore, this research study aims to assess the level of comprehension among construction industry players in the Klang Valley regarding the environmental impact of construction activities. It also seeks to identify the challenges they face in implementing effective project management in construction projects and determine the most efficient approach to implement project management from the pre-construction stage to the post-construction stage, with the goal of minimising environmental impacts. Interviews were conducted with seven experienced experts who specialise in diverse construction projects. The findings indicated that they aware of the advantages, but they faced major hurdles in putting those advantages into action. Despite their awareness of the advantages, they were unable to successfully implement them. UUM Press 2023 Article PeerReviewed application/pdf en cc4_by https://repo.uum.edu.my/id/eprint/30243/1/JTOM%2018%2002%202023%2060-72.pdf Ismail, Radzi and Othmani, Muhammad Izzat and Said, Ilias and Dan, Wang (2023) The Effective Project Management Approach Towards Minimising Environmental Impacts in The Construction Industry. Journal of Technology and Operations Management (JTOM), 18 (2). pp. 60-72. ISSN 2590-4175 (Online) https://e-journal.uum.edu.my/index.php/jtom/article/view/22030 https://doi.org/10.32890/jtom2023.18.2.5 https://doi.org/10.32890/jtom2023.18.2.5
institution Universiti Utara Malaysia
building UUM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Utara Malaysia
content_source UUM Institutional Repository
url_provider http://repo.uum.edu.my/
language English
topic HD28 Management. Industrial Management
spellingShingle HD28 Management. Industrial Management
Ismail, Radzi
Othmani, Muhammad Izzat
Said, Ilias
Dan, Wang
The Effective Project Management Approach Towards Minimising Environmental Impacts in The Construction Industry
description One factor in a nation’s successful economic growth and social well-being is the construction industry. Regrettably, the construction industry is also associated with a range of environmental impacts, including air pollution, noise pollution, soil contamination, and other related problems. The construction activities will have a detrimental environmental effect, significantly impacting the comfort and quality of life of individuals, particularly in urban regions like Klang Valey, Malaysia, where the pace of development is very rapid. However, project management approaches in construction projects can efficiently reduce adverse environmental impacts. Nevertheless, the adoption of project management approaches in construction projects, particularly in medium to small scale ones, remains significantly low. Although the use of project management has numerous advantages, it also presents significant hurdles for construction professionals in efficiently incorporating it into their professions, particularly in Klang Valley. Therefore, this research study aims to assess the level of comprehension among construction industry players in the Klang Valley regarding the environmental impact of construction activities. It also seeks to identify the challenges they face in implementing effective project management in construction projects and determine the most efficient approach to implement project management from the pre-construction stage to the post-construction stage, with the goal of minimising environmental impacts. Interviews were conducted with seven experienced experts who specialise in diverse construction projects. The findings indicated that they aware of the advantages, but they faced major hurdles in putting those advantages into action. Despite their awareness of the advantages, they were unable to successfully implement them.
format Article
author Ismail, Radzi
Othmani, Muhammad Izzat
Said, Ilias
Dan, Wang
author_facet Ismail, Radzi
Othmani, Muhammad Izzat
Said, Ilias
Dan, Wang
author_sort Ismail, Radzi
title The Effective Project Management Approach Towards Minimising Environmental Impacts in The Construction Industry
title_short The Effective Project Management Approach Towards Minimising Environmental Impacts in The Construction Industry
title_full The Effective Project Management Approach Towards Minimising Environmental Impacts in The Construction Industry
title_fullStr The Effective Project Management Approach Towards Minimising Environmental Impacts in The Construction Industry
title_full_unstemmed The Effective Project Management Approach Towards Minimising Environmental Impacts in The Construction Industry
title_sort effective project management approach towards minimising environmental impacts in the construction industry
publisher UUM Press
publishDate 2023
url https://repo.uum.edu.my/id/eprint/30243/1/JTOM%2018%2002%202023%2060-72.pdf
https://doi.org/10.32890/jtom2023.18.2.5
https://repo.uum.edu.my/id/eprint/30243/
https://e-journal.uum.edu.my/index.php/jtom/article/view/22030
https://doi.org/10.32890/jtom2023.18.2.5
_version_ 1789428561495457792
score 13.159267