Investigating factors of delay in IBS construction project: manufacturer perspectives
Government of Malaysia has enthusiastically supported the implementation of Industrialized Building System (IBS) that was early introduced in 1960’s. IBS is seen capable to ease the problem of delay that has been long haunting Malaysian construction industry. However, the issue of delay still exists...
保存先:
主要な著者: | , , , , |
---|---|
フォーマット: | 論文 |
言語: | English |
出版事項: |
School of Engineering, Taylor’s University College
2019
|
主題: | |
オンライン・アクセス: | http://repo.uum.edu.my/26099/1/JESTEC%202019%2059%2066.pdf http://repo.uum.edu.my/26099/ |
タグ: |
タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!
|