Investigating factors of delay in IBS construction project: manufacturer perspectives

Government of Malaysia has enthusiastically supported the implementation of Industrialized Building System (IBS) that was early introduced in 1960’s. IBS is seen capable to ease the problem of delay that has been long haunting Malaysian construction industry. However, the issue of delay still exists...

Full description

Saved in:
Bibliographic Details
Main Authors: Mohd Nawi, Mohd Nasrun, Mohd Nasir, Najuwa, Azman, Mohamed Nor Azhari, Jumintono, Jumintono, Khairudin, Moh
Format: Article
Language:English
Published: School of Engineering, Taylor’s University College 2019
Subjects:
Online Access:http://repo.uum.edu.my/26099/1/JESTEC%202019%2059%2066.pdf
http://repo.uum.edu.my/26099/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uum.repo.26099
record_format eprints
spelling my.uum.repo.260992019-06-12T06:05:39Z http://repo.uum.edu.my/26099/ Investigating factors of delay in IBS construction project: manufacturer perspectives Mohd Nawi, Mohd Nasrun Mohd Nasir, Najuwa Azman, Mohamed Nor Azhari Jumintono, Jumintono Khairudin, Moh HD28 Management. Industrial Management Government of Malaysia has enthusiastically supported the implementation of Industrialized Building System (IBS) that was early introduced in 1960’s. IBS is seen capable to ease the problem of delay that has been long haunting Malaysian construction industry. However, the issue of delay still exists even though IBS has been implemented in construction project and it is believed that there are other factors causing delay in IBS project. Thus, this paper aims to identify the factors of delay in IBS construction project through semi-structured interviews. Data on the study variables has been collected through interviews were conducted to explore the real-life construction situation in Malaysia. Factors of delay in IBS construction project are application of casting in-site by client, usage of dry mix cement, not fully implementation IBS method by clients in construction works, changes in design by client, delay in conforming the building design by client, delay in payment from client and delay of materials delivery from supplier. As an overall, results indicated that client-related factors are the most significant contributors in the delay of IBS project. The phenomena of delay in IBS construction project may require serious attention in overcoming the potential of delay factors and enhance the sustainability of IBS implementation in Malaysian construction industry. School of Engineering, Taylor’s University College 2019-06 Article PeerReviewed application/pdf en http://repo.uum.edu.my/26099/1/JESTEC%202019%2059%2066.pdf Mohd Nawi, Mohd Nasrun and Mohd Nasir, Najuwa and Azman, Mohamed Nor Azhari and Jumintono, Jumintono and Khairudin, Moh (2019) Investigating factors of delay in IBS construction project: manufacturer perspectives. Journal of Engineering Science and Technology (SI). pp. 59-66. ISSN 1823-4690
institution Universiti Utara Malaysia
building UUM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Utara Malaysia
content_source UUM Institutionali Repository
url_provider http://repo.uum.edu.my/
language English
topic HD28 Management. Industrial Management
spellingShingle HD28 Management. Industrial Management
Mohd Nawi, Mohd Nasrun
Mohd Nasir, Najuwa
Azman, Mohamed Nor Azhari
Jumintono, Jumintono
Khairudin, Moh
Investigating factors of delay in IBS construction project: manufacturer perspectives
description Government of Malaysia has enthusiastically supported the implementation of Industrialized Building System (IBS) that was early introduced in 1960’s. IBS is seen capable to ease the problem of delay that has been long haunting Malaysian construction industry. However, the issue of delay still exists even though IBS has been implemented in construction project and it is believed that there are other factors causing delay in IBS project. Thus, this paper aims to identify the factors of delay in IBS construction project through semi-structured interviews. Data on the study variables has been collected through interviews were conducted to explore the real-life construction situation in Malaysia. Factors of delay in IBS construction project are application of casting in-site by client, usage of dry mix cement, not fully implementation IBS method by clients in construction works, changes in design by client, delay in conforming the building design by client, delay in payment from client and delay of materials delivery from supplier. As an overall, results indicated that client-related factors are the most significant contributors in the delay of IBS project. The phenomena of delay in IBS construction project may require serious attention in overcoming the potential of delay factors and enhance the sustainability of IBS implementation in Malaysian construction industry.
format Article
author Mohd Nawi, Mohd Nasrun
Mohd Nasir, Najuwa
Azman, Mohamed Nor Azhari
Jumintono, Jumintono
Khairudin, Moh
author_facet Mohd Nawi, Mohd Nasrun
Mohd Nasir, Najuwa
Azman, Mohamed Nor Azhari
Jumintono, Jumintono
Khairudin, Moh
author_sort Mohd Nawi, Mohd Nasrun
title Investigating factors of delay in IBS construction project: manufacturer perspectives
title_short Investigating factors of delay in IBS construction project: manufacturer perspectives
title_full Investigating factors of delay in IBS construction project: manufacturer perspectives
title_fullStr Investigating factors of delay in IBS construction project: manufacturer perspectives
title_full_unstemmed Investigating factors of delay in IBS construction project: manufacturer perspectives
title_sort investigating factors of delay in ibs construction project: manufacturer perspectives
publisher School of Engineering, Taylor’s University College
publishDate 2019
url http://repo.uum.edu.my/26099/1/JESTEC%202019%2059%2066.pdf
http://repo.uum.edu.my/26099/
_version_ 1644284506568392704
score 13.149126