Development of a framework for effective integrated design team delivery in Malaysia IBS projects
Malaysia, like any other developing country, considers the construction industry as one of the main contributors to its Gross domestic product (GDP).It is currently facing the housing shortfall crisis.Due to the combination of infamous problems associated with the construction industry, such a fragm...
Saved in:
Main Authors: | Bahaudin, Ahmad Yusni, Mohd Nawi, Mohd Nasrun, Omar, Mohd Faizal, Romli, Ruslan, Mohamed Elias, Ezanee |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Utara Malaysia
|
Subjects: | |
Online Access: | http://repo.uum.edu.my/24796/1/12676.pdf http://repo.uum.edu.my/24796/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
An overview of project delivery methods in construction industry
by: Syed Zubir, Syarifah Zaliha, et al.
Published: (2018) -
Supply Chain Management (SCM): Disintegration Team Factors in Malaysian Industrialised Building System (IBS) Construction Projects
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2018) -
Dimension of fully integrated delivery team for Malaysian industrialised building system (IBS) construction projects
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2013) -
Construction procurement practice: a review study of Integrated Project Delivery (IPD) in the Malaysian construction projects
by: Syed Zuber, Sharifah Zaliha, et al.
Published: (2019) -
Investigating factors of delay in IBS construction project: manufacturer perspectives
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2019)