Developing agent based heuristic optimisation system for complex flow shops with customer-imposed production distruptions
The study of complex manufacturing flow-shops has seen a number of approaches and frameworks proposed to tackle various production-associated problems. However, unpredictable disruptions, such as change in sequence of order, order cancellation and change in production delivery due time, imposed by c...
Saved in:
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Universiti Utara Malaysia
2018
|
Subjects: | |
Online Access: | http://repo.uum.edu.my/24027/1/JICT%2018%202%20%202018%20291%E2%80%93322.pdf http://repo.uum.edu.my/24027/ http://jict.uum.edu.my/index.php/current-issues#A4 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uum.repo.24027 |
---|---|
record_format |
eprints |
spelling |
my.uum.repo.240272018-04-29T01:41:44Z http://repo.uum.edu.my/24027/ Developing agent based heuristic optimisation system for complex flow shops with customer-imposed production distruptions Adediran, Tunde Victor Al-Bazi, Ammar QA75 Electronic computers. Computer science The study of complex manufacturing flow-shops has seen a number of approaches and frameworks proposed to tackle various production-associated problems. However, unpredictable disruptions, such as change in sequence of order, order cancellation and change in production delivery due time, imposed by customers on flow-shops that impact production processes and inventory control call for a more adaptive approach capable of responding to these changes. In this research work, a new adaptive framework and agent-based heuristic optimization system was developed to investigate the disruption consequences and recovery strategy. A case study using an Original Equipment Manufacturer (OEM) production process of automotive parts and components was adopted to justify the proposed system. The results of the experiment revealed significant improvement in terms of total number of late orders, order delivery time, number of setups and resources utilization, which provide useful information for manufacturer’s decision-making policies. Universiti Utara Malaysia 2018 Article PeerReviewed application/pdf en http://repo.uum.edu.my/24027/1/JICT%2018%202%20%202018%20291%E2%80%93322.pdf Adediran, Tunde Victor and Al-Bazi, Ammar (2018) Developing agent based heuristic optimisation system for complex flow shops with customer-imposed production distruptions. Journal of Information and Communication Technology (JICT), 18 (2). pp. 291-322. ISSN 1675-414X http://jict.uum.edu.my/index.php/current-issues#A4 |
institution |
Universiti Utara Malaysia |
building |
UUM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Utara Malaysia |
content_source |
UUM Institutionali Repository |
url_provider |
http://repo.uum.edu.my/ |
language |
English |
topic |
QA75 Electronic computers. Computer science |
spellingShingle |
QA75 Electronic computers. Computer science Adediran, Tunde Victor Al-Bazi, Ammar Developing agent based heuristic optimisation system for complex flow shops with customer-imposed production distruptions |
description |
The study of complex manufacturing flow-shops has seen a number of approaches and frameworks proposed to tackle various production-associated problems. However, unpredictable disruptions, such as change in sequence of order, order cancellation and change in production delivery due time, imposed by customers on flow-shops that impact production processes and inventory control call for a more adaptive approach capable of responding to these changes. In this research work, a new adaptive framework and agent-based heuristic optimization system was developed to investigate the disruption consequences and recovery strategy. A case study using an Original Equipment Manufacturer (OEM) production process of automotive parts and components was adopted to justify the proposed system. The results of the experiment revealed significant improvement in terms of total number of late orders, order delivery time, number of setups and resources utilization, which provide useful information for manufacturer’s decision-making policies. |
format |
Article |
author |
Adediran, Tunde Victor Al-Bazi, Ammar |
author_facet |
Adediran, Tunde Victor Al-Bazi, Ammar |
author_sort |
Adediran, Tunde Victor |
title |
Developing agent based heuristic optimisation system for complex flow shops with customer-imposed production distruptions |
title_short |
Developing agent based heuristic optimisation system for complex flow shops with customer-imposed production distruptions |
title_full |
Developing agent based heuristic optimisation system for complex flow shops with customer-imposed production distruptions |
title_fullStr |
Developing agent based heuristic optimisation system for complex flow shops with customer-imposed production distruptions |
title_full_unstemmed |
Developing agent based heuristic optimisation system for complex flow shops with customer-imposed production distruptions |
title_sort |
developing agent based heuristic optimisation system for complex flow shops with customer-imposed production distruptions |
publisher |
Universiti Utara Malaysia |
publishDate |
2018 |
url |
http://repo.uum.edu.my/24027/1/JICT%2018%202%20%202018%20291%E2%80%93322.pdf http://repo.uum.edu.my/24027/ http://jict.uum.edu.my/index.php/current-issues#A4 |
_version_ |
1644283944205549568 |
score |
13.160551 |