Technology barriers of industrialized building system (IBS): the Malaysian case
Industrialized Building System (IBS) is an alternative construction method that was introduced to improve the productivity of the Malaysian construction project.The implementation of IBS in the Malaysian construction industries not only could reduce the time of construction process, but it also can...
Saved in:
Main Authors: | , |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
Universiti Putra Malaysia Press
2017
|
Subjects: | |
Online Access: | http://repo.uum.edu.my/22374/1/STML%E2%80%93Go%20Green%202016%2032%2040.pdf http://repo.uum.edu.my/22374/ http://stmlportal.net/stmlgogreen2016/pdf/p32.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uum.repo.22374 |
---|---|
record_format |
eprints |
spelling |
my.uum.repo.223742017-07-05T02:58:42Z http://repo.uum.edu.my/22374/ Technology barriers of industrialized building system (IBS): the Malaysian case Abd Razak, Rohaida Mohd Nawi, Mohd Nasrun TH Building construction Industrialized Building System (IBS) is an alternative construction method that was introduced to improve the productivity of the Malaysian construction project.The implementation of IBS in the Malaysian construction industries not only could reduce the time of construction process, but it also can provide better site management, reduce labour intensity, improve the quality and the efficiency of construction. Even though the implementation of IBS had been introduced since 50 years ago, however the level of its uptake is still far away from the ideal objectives of the Government.Therefore, this research had been carried out in order to analyse and explore this issue deeper by identifying the definition of IBS, the categories of IBS and the technology barriers of IBS that occurs in the Malaysian construction industries.For additional information, the scope of this study was focused in both areas of Kedah and Perlis.In order to investigate the problem, this research had been generated to identify the barriers of IBS implementation by using a qualitative research approach which is face – to – face interview technique.The data that had been obtained from the interviews had been analysed using the content analysis technique. As for conclusion, the technology barriers of IBS in Kedah construction projects such as cost issues and design factors had been identified and discussed. Universiti Putra Malaysia Press 2017 Conference or Workshop Item PeerReviewed application/pdf en http://repo.uum.edu.my/22374/1/STML%E2%80%93Go%20Green%202016%2032%2040.pdf Abd Razak, Rohaida and Mohd Nawi, Mohd Nasrun (2017) Technology barriers of industrialized building system (IBS): the Malaysian case. In: Symposium on Technology Management & Logistics (STML–Go Green) 2016, 6th - 7th December 2016, Universiti Utara Malaysia, Sintok, Malaysia. http://stmlportal.net/stmlgogreen2016/pdf/p32.pdf |
institution |
Universiti Utara Malaysia |
building |
UUM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Utara Malaysia |
content_source |
UUM Institutionali Repository |
url_provider |
http://repo.uum.edu.my/ |
language |
English |
topic |
TH Building construction |
spellingShingle |
TH Building construction Abd Razak, Rohaida Mohd Nawi, Mohd Nasrun Technology barriers of industrialized building system (IBS): the Malaysian case |
description |
Industrialized Building System (IBS) is an alternative construction method that was
introduced to improve the productivity of the Malaysian construction project.The implementation of IBS in the Malaysian construction industries not only could reduce the time of construction process, but it also can provide better site management, reduce labour intensity, improve the quality and the efficiency of construction. Even though the implementation of IBS had been introduced since 50 years ago, however the level
of its uptake is still far away from the ideal objectives of the Government.Therefore,
this research had been carried out in order to analyse and explore this issue deeper by identifying the definition of IBS, the categories of IBS and the technology barriers of
IBS that occurs in the Malaysian construction industries.For additional information, the scope of this study was focused in both areas of Kedah and Perlis.In order to investigate the problem, this research had been generated to identify the barriers of IBS implementation by using a qualitative research approach which is face – to – face interview technique.The data that had been obtained from the interviews had been
analysed using the content analysis technique. As for conclusion, the technology barriers of IBS in Kedah construction projects such as cost issues and design factors had been identified and discussed. |
format |
Conference or Workshop Item |
author |
Abd Razak, Rohaida Mohd Nawi, Mohd Nasrun |
author_facet |
Abd Razak, Rohaida Mohd Nawi, Mohd Nasrun |
author_sort |
Abd Razak, Rohaida |
title |
Technology barriers of industrialized building system (IBS): the Malaysian case |
title_short |
Technology barriers of industrialized building system (IBS): the Malaysian case |
title_full |
Technology barriers of industrialized building system (IBS): the Malaysian case |
title_fullStr |
Technology barriers of industrialized building system (IBS): the Malaysian case |
title_full_unstemmed |
Technology barriers of industrialized building system (IBS): the Malaysian case |
title_sort |
technology barriers of industrialized building system (ibs): the malaysian case |
publisher |
Universiti Putra Malaysia Press |
publishDate |
2017 |
url |
http://repo.uum.edu.my/22374/1/STML%E2%80%93Go%20Green%202016%2032%2040.pdf http://repo.uum.edu.my/22374/ http://stmlportal.net/stmlgogreen2016/pdf/p32.pdf |
_version_ |
1644283500711378944 |
score |
13.2014675 |