Resource based view perspective of the on time delivery in aerospace composites manufacturing company in Malaysia
Aerospace industry is a high cost and high technology base operations.Every minute and seconds count as cost is getting higher with longer time taken to complete the product and deliver to customer.On time delivery is the key performance in the aerospace industry be it service or manufacturing.An...
Saved in:
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
2016
|
Subjects: | |
Online Access: | http://repo.uum.edu.my/22260/1/IJMER%206%2010%202016%2015%2020.pdf http://repo.uum.edu.my/22260/ http://www.ijmer.com/pages/Vol.6-Iss.10(Version-2).html |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uum.repo.22260 |
---|---|
record_format |
eprints |
spelling |
my.uum.repo.222602017-06-06T02:53:55Z http://repo.uum.edu.my/22260/ Resource based view perspective of the on time delivery in aerospace composites manufacturing company in Malaysia Long, Rozita Mohtar, Shahimi Ahmad, Fakhrorazi TS Manufactures Aerospace industry is a high cost and high technology base operations.Every minute and seconds count as cost is getting higher with longer time taken to complete the product and deliver to customer.On time delivery is the key performance in the aerospace industry be it service or manufacturing.An aerospace organization (service or manufacturing) must manage its resources and capabilities to achieve and sustain the on time delivery.This article is to provide a literature reviews of the on time delivery processes in an aerospace manufacturing company in Malaysia from a Resource Based View perspective. This review will be an input to the aerospace manufacturing company and aerospace industry in Malaysia as an optional strategy in managing resources and capabilities in order to meet and sustain the on time delivery. 2016 Article PeerReviewed application/pdf en http://repo.uum.edu.my/22260/1/IJMER%206%2010%202016%2015%2020.pdf Long, Rozita and Mohtar, Shahimi and Ahmad, Fakhrorazi (2016) Resource based view perspective of the on time delivery in aerospace composites manufacturing company in Malaysia. International Journal of Modern Engineering Research (IJMER), 6 (10). pp. 15-20. ISSN 2249–6645 http://www.ijmer.com/pages/Vol.6-Iss.10(Version-2).html |
institution |
Universiti Utara Malaysia |
building |
UUM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Utara Malaysia |
content_source |
UUM Institutionali Repository |
url_provider |
http://repo.uum.edu.my/ |
language |
English |
topic |
TS Manufactures |
spellingShingle |
TS Manufactures Long, Rozita Mohtar, Shahimi Ahmad, Fakhrorazi Resource based view perspective of the on time delivery in aerospace composites manufacturing company in Malaysia |
description |
Aerospace industry is a high cost and high technology base operations.Every minute
and seconds count as cost is getting higher with longer time taken to complete the product and
deliver to customer.On time delivery is the key performance in the aerospace industry be it
service or manufacturing.An aerospace organization (service or manufacturing) must manage its
resources and capabilities to achieve and sustain the on time delivery.This article is to provide a
literature reviews of the on time delivery processes in an aerospace manufacturing company in
Malaysia from a Resource Based View perspective. This review will be an input to the aerospace
manufacturing company and aerospace industry in Malaysia as an optional strategy in managing
resources and capabilities in order to meet and sustain the on time delivery. |
format |
Article |
author |
Long, Rozita Mohtar, Shahimi Ahmad, Fakhrorazi |
author_facet |
Long, Rozita Mohtar, Shahimi Ahmad, Fakhrorazi |
author_sort |
Long, Rozita |
title |
Resource based view perspective of the on time delivery in aerospace composites manufacturing company in Malaysia |
title_short |
Resource based view perspective of the on time delivery in aerospace composites manufacturing company in Malaysia |
title_full |
Resource based view perspective of the on time delivery in aerospace composites manufacturing company in Malaysia |
title_fullStr |
Resource based view perspective of the on time delivery in aerospace composites manufacturing company in Malaysia |
title_full_unstemmed |
Resource based view perspective of the on time delivery in aerospace composites manufacturing company in Malaysia |
title_sort |
resource based view perspective of the on time delivery in aerospace composites manufacturing company in malaysia |
publishDate |
2016 |
url |
http://repo.uum.edu.my/22260/1/IJMER%206%2010%202016%2015%2020.pdf http://repo.uum.edu.my/22260/ http://www.ijmer.com/pages/Vol.6-Iss.10(Version-2).html |
_version_ |
1644283467867881472 |
score |
13.214268 |