Resource based view perspective of the on time delivery in aerospace composites manufacturing company in Malaysia

Aerospace industry is a high cost and high technology base operations.Every minute and seconds count as cost is getting higher with longer time taken to complete the product and deliver to customer.On time delivery is the key performance in the aerospace industry be it service or manufacturing.An...

Full description

Saved in:
Bibliographic Details
Main Authors: Long, Rozita, Mohtar, Shahimi, Ahmad, Fakhrorazi
Format: Article
Language:English
Published: 2016
Subjects:
Online Access:http://repo.uum.edu.my/22260/1/IJMER%206%2010%202016%2015%2020.pdf
http://repo.uum.edu.my/22260/
http://www.ijmer.com/pages/Vol.6-Iss.10(Version-2).html
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uum.repo.22260
record_format eprints
spelling my.uum.repo.222602017-06-06T02:53:55Z http://repo.uum.edu.my/22260/ Resource based view perspective of the on time delivery in aerospace composites manufacturing company in Malaysia Long, Rozita Mohtar, Shahimi Ahmad, Fakhrorazi TS Manufactures Aerospace industry is a high cost and high technology base operations.Every minute and seconds count as cost is getting higher with longer time taken to complete the product and deliver to customer.On time delivery is the key performance in the aerospace industry be it service or manufacturing.An aerospace organization (service or manufacturing) must manage its resources and capabilities to achieve and sustain the on time delivery.This article is to provide a literature reviews of the on time delivery processes in an aerospace manufacturing company in Malaysia from a Resource Based View perspective. This review will be an input to the aerospace manufacturing company and aerospace industry in Malaysia as an optional strategy in managing resources and capabilities in order to meet and sustain the on time delivery. 2016 Article PeerReviewed application/pdf en http://repo.uum.edu.my/22260/1/IJMER%206%2010%202016%2015%2020.pdf Long, Rozita and Mohtar, Shahimi and Ahmad, Fakhrorazi (2016) Resource based view perspective of the on time delivery in aerospace composites manufacturing company in Malaysia. International Journal of Modern Engineering Research (IJMER), 6 (10). pp. 15-20. ISSN 2249–6645 http://www.ijmer.com/pages/Vol.6-Iss.10(Version-2).html
institution Universiti Utara Malaysia
building UUM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Utara Malaysia
content_source UUM Institutionali Repository
url_provider http://repo.uum.edu.my/
language English
topic TS Manufactures
spellingShingle TS Manufactures
Long, Rozita
Mohtar, Shahimi
Ahmad, Fakhrorazi
Resource based view perspective of the on time delivery in aerospace composites manufacturing company in Malaysia
description Aerospace industry is a high cost and high technology base operations.Every minute and seconds count as cost is getting higher with longer time taken to complete the product and deliver to customer.On time delivery is the key performance in the aerospace industry be it service or manufacturing.An aerospace organization (service or manufacturing) must manage its resources and capabilities to achieve and sustain the on time delivery.This article is to provide a literature reviews of the on time delivery processes in an aerospace manufacturing company in Malaysia from a Resource Based View perspective. This review will be an input to the aerospace manufacturing company and aerospace industry in Malaysia as an optional strategy in managing resources and capabilities in order to meet and sustain the on time delivery.
format Article
author Long, Rozita
Mohtar, Shahimi
Ahmad, Fakhrorazi
author_facet Long, Rozita
Mohtar, Shahimi
Ahmad, Fakhrorazi
author_sort Long, Rozita
title Resource based view perspective of the on time delivery in aerospace composites manufacturing company in Malaysia
title_short Resource based view perspective of the on time delivery in aerospace composites manufacturing company in Malaysia
title_full Resource based view perspective of the on time delivery in aerospace composites manufacturing company in Malaysia
title_fullStr Resource based view perspective of the on time delivery in aerospace composites manufacturing company in Malaysia
title_full_unstemmed Resource based view perspective of the on time delivery in aerospace composites manufacturing company in Malaysia
title_sort resource based view perspective of the on time delivery in aerospace composites manufacturing company in malaysia
publishDate 2016
url http://repo.uum.edu.my/22260/1/IJMER%206%2010%202016%2015%2020.pdf
http://repo.uum.edu.my/22260/
http://www.ijmer.com/pages/Vol.6-Iss.10(Version-2).html
_version_ 1644283467867881472
score 13.214268