Key factors of readiness in the implementation of Industrialised Building System (IBS)
Although IBS has been introduced since the 1960, and many advantages that have identified for the implementation of IBS in Malaysia, yet the level of implementation of IBS still did not achieve the government target.Previous studies have been conducted to identify the factors that contribute to the...
Saved in:
Main Authors: | Tamrin, Norhidayah, Mohd Nawi, Mohd Nasrun, Abdul Nifa, Faizatul Akmar |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2016
|
Subjects: | |
Online Access: | http://repo.uum.edu.my/19552/1/ICAST%E2%80%9916%201%207.pdf http://repo.uum.edu.my/19552/ http://doi.org/10.1063/1.4960943 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Payment issues in Malaysia industrialised building system (IBS): Literature visit
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2015) -
Malaysian Industrialised Building System (IBS): A review of studies
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2015) -
A preliminary survey of the application of Industrialised Building System (IBS)in Kedah and Perlis Malaysian construction industry
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2007) -
Payment issues in Malaysia Industrialised Building System (IBS): A research framework
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2015) -
Industrialized building system in construction projects: a study on readiness
by: Tamrin, Norhidayah, et al.
Published: (2017)