Critical success factors for improving team integration in Industrialised Building System (IBS) construction projects: The Malaysian case

Industrialised Building System (IBS) is defined as a construction technique in which components are manufactured in a controlled environment (on or off site), transported, positioned and assembled into a structure with minimal additional site work. The Malaysian construction industry has been urged...

全面介绍

Saved in:
书目详细资料
Main Authors: Mohd Nawi, Mohd Nasrun, Lee, Angela, Mohamad Kamar, Kamarul Anuar, Abd Hamid, Zuhairi
格式: Article
语言:English
出版: Construction Research Institute of Malaysia (CREAM) 2012
主题:
在线阅读:http://repo.uum.edu.my/17894/1/MCRJ%2010%201%2044-62.pdf
http://repo.uum.edu.my/17894/
http://www.cream.my/about-mcrj/download-mcrj.html
标签: 添加标签
没有标签, 成为第一个标记此记录!