Critical success factors for improving team integration in Industrialised Building System (IBS) construction projects: The Malaysian case
Industrialised Building System (IBS) is defined as a construction technique in which components are manufactured in a controlled environment (on or off site), transported, positioned and assembled into a structure with minimal additional site work. The Malaysian construction industry has been urged...
Saved in:
Main Authors: | Mohd Nawi, Mohd Nasrun, Lee, Angela, Mohamad Kamar, Kamarul Anuar, Abd Hamid, Zuhairi |
---|---|
Format: | Article |
Language: | English |
Published: |
Construction Research Institute of Malaysia (CREAM)
2012
|
Subjects: | |
Online Access: | http://repo.uum.edu.my/17894/1/MCRJ%2010%201%2044-62.pdf http://repo.uum.edu.my/17894/ http://www.cream.my/about-mcrj/download-mcrj.html |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A critical literature review on the concept of team integration in Industrialised Building System (IBS) project
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2011) -
The experiences of Malaysian in industrialised building system (IBS) to enhance construct ability and sustainability in construction project
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2011) -
Fragmentation issue in Malaysian Industrialised Building System (IBS) projects
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2014) -
IBS survey 2010: Drivers, barriers and critical success factors in adopting industrialised building system (IBS) construction by G7 contractors in Malaysia
by: Mohamad Kamar, Kamarul Anuar, et al.
Published: (2014) -
Dimension of fully integrated delivery team for Malaysian industrialised building system (IBS) construction projects
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2013)