Critical success factors for improving team integration in Industrialised Building System (IBS) construction projects: The Malaysian case

Industrialised Building System (IBS) is defined as a construction technique in which components are manufactured in a controlled environment (on or off site), transported, positioned and assembled into a structure with minimal additional site work. The Malaysian construction industry has been urged...

全面介紹

Saved in:
書目詳細資料
Main Authors: Mohd Nawi, Mohd Nasrun, Lee, Angela, Mohamad Kamar, Kamarul Anuar, Abd Hamid, Zuhairi
格式: Article
語言:English
出版: Construction Research Institute of Malaysia (CREAM) 2012
主題:
在線閱讀:http://repo.uum.edu.my/17894/1/MCRJ%2010%201%2044-62.pdf
http://repo.uum.edu.my/17894/
http://www.cream.my/about-mcrj/download-mcrj.html
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!