Critical success factors for improving team integration in Industrialised Building System (IBS) construction projects: The Malaysian case

Industrialised Building System (IBS) is defined as a construction technique in which components are manufactured in a controlled environment (on or off site), transported, positioned and assembled into a structure with minimal additional site work. The Malaysian construction industry has been urged...

詳細記述

保存先:
書誌詳細
主要な著者: Mohd Nawi, Mohd Nasrun, Lee, Angela, Mohamad Kamar, Kamarul Anuar, Abd Hamid, Zuhairi
フォーマット: 論文
言語:English
出版事項: Construction Research Institute of Malaysia (CREAM) 2012
主題:
オンライン・アクセス:http://repo.uum.edu.my/17894/1/MCRJ%2010%201%2044-62.pdf
http://repo.uum.edu.my/17894/
http://www.cream.my/about-mcrj/download-mcrj.html
タグ: タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!