Critical success factors for improving team integration in Industrialised Building System (IBS) construction projects: The Malaysian case
Industrialised Building System (IBS) is defined as a construction technique in which components are manufactured in a controlled environment (on or off site), transported, positioned and assembled into a structure with minimal additional site work. The Malaysian construction industry has been urged...
Saved in:
Main Authors: | Mohd Nawi, Mohd Nasrun, Lee, Angela, Mohamad Kamar, Kamarul Anuar, Abd Hamid, Zuhairi |
---|---|
格式: | Article |
語言: | English |
出版: |
Construction Research Institute of Malaysia (CREAM)
2012
|
主題: | |
在線閱讀: | http://repo.uum.edu.my/17894/1/MCRJ%2010%201%2044-62.pdf http://repo.uum.edu.my/17894/ http://www.cream.my/about-mcrj/download-mcrj.html |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
A critical literature review on the concept of team integration in Industrialised Building System (IBS) project
由: Mohd Nawi, Mohd Nasrun, et al.
出版: (2011) -
The experiences of Malaysian in industrialised building system (IBS) to enhance construct ability and sustainability in construction project
由: Mohd Nawi, Mohd Nasrun, et al.
出版: (2011) -
Fragmentation issue in Malaysian Industrialised Building System (IBS) projects
由: Mohd Nawi, Mohd Nasrun, et al.
出版: (2014) -
IBS survey 2010: Drivers, barriers and critical success factors in adopting industrialised building system (IBS) construction by G7 contractors in Malaysia
由: Mohamad Kamar, Kamarul Anuar, et al.
出版: (2014) -
Dimension of fully integrated delivery team for Malaysian industrialised building system (IBS) construction projects
由: Mohd Nawi, Mohd Nasrun, et al.
出版: (2013)