Critical success factors for improving team integration in Industrialised Building System (IBS) construction projects: The Malaysian case
Industrialised Building System (IBS) is defined as a construction technique in which components are manufactured in a controlled environment (on or off site), transported, positioned and assembled into a structure with minimal additional site work. The Malaysian construction industry has been urged...
محفوظ في:
المؤلفون الرئيسيون: | Mohd Nawi, Mohd Nasrun, Lee, Angela, Mohamad Kamar, Kamarul Anuar, Abd Hamid, Zuhairi |
---|---|
التنسيق: | مقال |
اللغة: | English |
منشور في: |
Construction Research Institute of Malaysia (CREAM)
2012
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://repo.uum.edu.my/17894/1/MCRJ%2010%201%2044-62.pdf http://repo.uum.edu.my/17894/ http://www.cream.my/about-mcrj/download-mcrj.html |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
A critical literature review on the concept of team integration in Industrialised Building System (IBS) project
بواسطة: Mohd Nawi, Mohd Nasrun, وآخرون
منشور في: (2011) -
The experiences of Malaysian in industrialised building system (IBS) to enhance construct ability and sustainability in construction project
بواسطة: Mohd Nawi, Mohd Nasrun, وآخرون
منشور في: (2011) -
Fragmentation issue in Malaysian Industrialised Building System (IBS) projects
بواسطة: Mohd Nawi, Mohd Nasrun, وآخرون
منشور في: (2014) -
IBS survey 2010: Drivers, barriers and critical success factors in adopting industrialised building system (IBS) construction by G7 contractors in Malaysia
بواسطة: Mohamad Kamar, Kamarul Anuar, وآخرون
منشور في: (2014) -
Dimension of fully integrated delivery team for Malaysian industrialised building system (IBS) construction projects
بواسطة: Mohd Nawi, Mohd Nasrun, وآخرون
منشور في: (2013)