The experiences of Malaysian in industrialised building system (IBS) to enhance construct ability and sustainability in construction project
The reality of construction is that most of the problems encountered in the field such as reworks, delay and low in quality or productivity are often compounded by inherent design flaws that generated in the design phase.Implementing construct ability concept is an alternative solution to overcome t...
Saved in:
Main Authors: | Mohd Nawi, Mohd Nasrun, Lee, Angela, Azman, Mohamed Azhary, Mohamad Kamar, Kamarul Anuar |
---|---|
格式: | Article |
语言: | English |
出版: |
UUM College of Business
2011
|
主题: | |
在线阅读: | http://repo.uum.edu.my/17853/1/JTOM%206%202%201-12.pdf http://repo.uum.edu.my/17853/ http://jtom.stmlportal.net/uncategorized/volume-6-number-2-december-2011/ |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
相似书籍
-
An ability of WhatsApp usage in Industrialised Building System (IBS) construction project
由: Ahmad Pozin, Mohd Affendi, et al.
出版: (2019) -
Fragmentation issue in Malaysian Industrialised Building System (IBS) projects
由: Mohd Nawi, Mohd Nasrun, et al.
出版: (2014) -
Fragmentation issue in Malaysian Industrialised Building System (IBS) projects
由: Mohd Nawi Mohd Nasrun, Lee Angela, Azman Mohamed Nor Azhari, Mohamad Kamar Kamarul Anuar,
出版: (2014) -
Critical success factors for improving team integration in Industrialised Building System (IBS) construction projects: The Malaysian case
由: Mohd Nawi, Mohd Nasrun, et al.
出版: (2012) -
A critical literature review on the concept of team integration in Industrialised Building System (IBS) project
由: Mohd Nawi, Mohd Nasrun, et al.
出版: (2011)