The experiences of Malaysian in industrialised building system (IBS) to enhance construct ability and sustainability in construction project
The reality of construction is that most of the problems encountered in the field such as reworks, delay and low in quality or productivity are often compounded by inherent design flaws that generated in the design phase.Implementing construct ability concept is an alternative solution to overcome t...
Saved in:
Main Authors: | Mohd Nawi, Mohd Nasrun, Lee, Angela, Azman, Mohamed Azhary, Mohamad Kamar, Kamarul Anuar |
---|---|
Format: | Article |
Language: | English |
Published: |
UUM College of Business
2011
|
Subjects: | |
Online Access: | http://repo.uum.edu.my/17853/1/JTOM%206%202%201-12.pdf http://repo.uum.edu.my/17853/ http://jtom.stmlportal.net/uncategorized/volume-6-number-2-december-2011/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Fragmentation issue in Malaysian Industrialised Building System (IBS) projects
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2014) -
Critical success factors for improving team integration in Industrialised Building System (IBS) construction projects: The Malaysian case
by: Mohd Nawi, Mohd Nasrun, et al.
Published: (2012) -
Adaptable effectiveness of industrialised building (IBS) in construction projects
by: Zulkarnain, Muhamad
Published: (2013) -
IBS survey 2010: Drivers, barriers and critical success factors in adopting industrialised building system (IBS) construction by G7 contractors in Malaysia
by: Mohamad Kamar, Kamarul Anuar, et al.
Published: (2014) -
An ability of WhatsApp usage in Industrialised Building System (IBS) construction project
by: Ahmad Pozin, Mohd Affendi, et al.
Published: (2019)