The experiences of Malaysian in industrialised building system (IBS) to enhance construct ability and sustainability in construction project
The reality of construction is that most of the problems encountered in the field such as reworks, delay and low in quality or productivity are often compounded by inherent design flaws that generated in the design phase.Implementing construct ability concept is an alternative solution to overcome t...
محفوظ في:
المؤلفون الرئيسيون: | Mohd Nawi, Mohd Nasrun, Lee, Angela, Azman, Mohamed Azhary, Mohamad Kamar, Kamarul Anuar |
---|---|
التنسيق: | مقال |
اللغة: | English |
منشور في: |
UUM College of Business
2011
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://repo.uum.edu.my/17853/1/JTOM%206%202%201-12.pdf http://repo.uum.edu.my/17853/ http://jtom.stmlportal.net/uncategorized/volume-6-number-2-december-2011/ |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
An ability of WhatsApp usage in Industrialised Building System (IBS) construction project
بواسطة: Ahmad Pozin, Mohd Affendi, وآخرون
منشور في: (2019) -
Fragmentation issue in Malaysian Industrialised Building System (IBS) projects
بواسطة: Mohd Nawi, Mohd Nasrun, وآخرون
منشور في: (2014) -
Fragmentation issue in Malaysian Industrialised Building System (IBS) projects
بواسطة: Mohd Nawi Mohd Nasrun, Lee Angela, Azman Mohamed Nor Azhari, Mohamad Kamar Kamarul Anuar,
منشور في: (2014) -
Critical success factors for improving team integration in Industrialised Building System (IBS) construction projects: The Malaysian case
بواسطة: Mohd Nawi, Mohd Nasrun, وآخرون
منشور في: (2012) -
A critical literature review on the concept of team integration in Industrialised Building System (IBS) project
بواسطة: Mohd Nawi, Mohd Nasrun, وآخرون
منشور في: (2011)